Hyundai HL970A Operator's Manual page 185

Table of Contents

Advertisement

6) 6)
LOADING
LOADING
Maximum efficiency can be attained by carrying
out work in such a way that the swinging angle
and the traveling distance are kept as small and
short as possible in accordance with the terrain.
(1)
(1)
I method
I method
After digging out the soil, move backward and
position the dump truck between the heap of
soil and the machine to load the soil into the
truck.
This is the fastest and most efficient way to load
material.
The ground of the jobsite should be always
The ground of the jobsite should be always
level and do not swing or step on a brake
level and do not swing or step on a brake
pedal abruptly with the boom raised.
pedal abruptly with the boom raised.
(2) (2)
V method
V method
Park the truck at an angle of 60 degrees toward
the machine. After digging out, drive backward
and position the machine at a right angle with
the truck and load the truck with the soil.
Position the machine so that the soil can be
dumped in the center of the truck.
If the length of the truck is more than double the
width of the bucket, perform the dumping work
from forward to backward.
Move the control lever to the right and dump the
bucket.
Shake the bucket to throw off the soil stuck
inside. Move the bucket control lever to the left
and right and attach the bucket to the stopper.
Shake the bucket before setting it to the DUMP
position so that loaded materials are evenly dis-
tributed inside the bucket. This will prevent
materials from slipping back when the bucket is
placed in the DUMP position.
4-19
73034OP12
73034OP13
960A4OP13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents