General Requirements; Power-Up; Local Display; Initial Startup - Siemens SITRANS F Operating Instructions Manual

Ultrasonic flowmeters
Hide thumbs Also See for SITRANS F:
Table of Contents

Advertisement

Commissioning

6.5 Initial startup

6.2

General requirements

Before commissioning it must be checked that:
• The device has been installed and connected in accordance with the guidelines provided
in Installing/mounting (Page 19) and Connecting (Page 25).
6.3

Power-up

Power up the device. Local display will show a screen for initial startup (Page 36).
6.4

Local display

The device is commissioned/operated with the touch keypad on the local display.
The graphic display above the keypad gives a menu-guided operation of the individual device
function/parameters. Successful operation of the key is confirmed by tactile feedback as key is
pressed.
Figure 6-1
Note
HMI timeout
If no key is pressed for 10 minutes, the display switches to show operation view. If Backlight is
set to Automatic, display backlight goes off automatically 30 seconds after the last key press.
6.5
Initial startup
The first time the device is powered up, you will be prompted to set the language. The device
always starts up showing "Language" in English. When the language has been set, you will be
prompted to set the date and time.
You will be asked if you want to start the "Quick commissioning" wizard. If you choose "Yes"
(recommended), the "Quick commissioning" wizard will start. If you choose "No", you accept the
default values of the device, and the next HMI view will be the operation view 1.
36
Full graphical display
Touch keypad
Local display
SITRANS FST020 IP65 (NEMA 4X)
Operating Instructions, 05/2022, A5E41425845-AC

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sitrans fst020 ip65 nema 4x

Table of Contents