ED2400 & ED2400(A) Series Surface Vertical Rod
Exit Devices
Installation Instructions
4
Installation, continued
b
Set Latches, Strikes, and Guides
Top Strike Detail
Shim (2 supplied)
(Start with one)
Strike plate
(Ridges face down)
Strike
(2) 10-24 x 5/8" MS or
(2) #10 X 1" WS (Flat Head)
Figure 11
c
Prepare Rods
Top Rod (Figure 12)
• Ready for 84" (2134 mm) Openings
Openings Under 84" (2134mm)
For top rod cutoff length, deduct opening height from 84"
(2132 mm).
Example:
Opening = 80" (2032 mm)
84-80 = 4" or (2134 mm) - (2032 mm) = (102 mm)
Top rod must be cut 4" (102 mm).
Openings Over 84" (2134mm)
For top rod additional length, deduct 84" (2134 mm) from
opening height.
Example:
Opening = 99" (2515 mm)
99" - 84" = 15" or (2515 mm) - (2134 mm) =
(381 mm)
The top rod must be lengthened 15" (381 mm).
For installation assistance contact Corbin Russwin
1-800-543-3658 • techsupport.corbinrusswin@assaabloy.com
Copyright © 2022, ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole or in part
without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
Top Rod
36-1/8"
(918 mm)
1/8 x 1/2 Rollpin
PRESS FLUSH
Top Rod Connector
Figure 12
11
FM572 10/22