Change Hands; B 1/4-20 Sex Nut Option; Rod Extention Options - Assa Abloy Corbin Russwin ED2400 Series Installation Instructions Manual

Surface vertical rod
Table of Contents

Advertisement

ED2400 & ED2400(A) Series Surface Vertical Rod
Exit Devices
Installation Instructions
2
General Information, continued

Change Hands

a
Remove four (4) screws and
vertical lifter assembly. Rotate
device to opposite hand (180˚).
Insert lifter assembly under
lift block and re-install screws.
Note
Lifter must fit under lift block as
shown. ( 1)
b
1/4-20 Sex Nut Option
Device
Quantity
No trim
8
With trim
6
Recommended for wood
composite or unreinforced
metal doors. (Figure 2)
c
Rod Extension Options
• 2" (51 mm)
• 6" (152 mm)
• 12" (305 mm)
For installation assistance contact Corbin Russwin
1-800-543-3658 • techsupport.corbinrusswin@assaabloy.com
Copyright © 2022, ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole or in part
without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
RHR Device
Vertical lifter
(4) 8-32 x 3/16" PRHMS
RHR Door
LHR Door
Figure 1
Size
1/4 - 20
Figure 2
Figure 3
Lift block
assembly
Note
Standard for Fire
Rated doors.
5
LHR Device
Vertical lifter
assembly
(4) 8-32 x 3/16" PRHMS
FM572 10/22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Corbin russwin ed2400a series

Table of Contents