Commissioning

6.1

Safety measures before commissioning

WARNING
Make yourself sufficiently familiar with
the operating elements of the lifting pins,
the equipment of the lifting pins,
the way the lifting pins works,
the immediate vicinity of the lifting pins,
the measures for emergencies.
Perform the following activities before initial commissioning or recommissioning:
Check and make sure that all components are installed and working.
Check the lifting pins for visible damage; immediately rectify any defects found or
report them to the supervisory staff – the lifting pin may only be operated in perfect
condition.
Check and make sure that only authorised persons are in the work area of the lifting
pins and that no other persons are endangered by use of the lifting pins.
Remove all objects and other materials from the place of use that are not required for
the operation of the lifting pins.
Keep a commissioning log.
Risk of injury due to lack of space!
A risk of injuries such as scratches, piercing or broken bones exists from
work equipment and/or components being arranged too closely together!
The set-up location of the lifting pins must be selected in such a way that
the room to manoeuvre necessary for personnel in the work area is not
restricted or impeded.
Only allow qualified personnel to carry out commissioning.
Cordon off the danger area.
Keep unauthorised persons away.
Designate a person to be in charge.
41