Baileigh Industrial TS-1040P-30-V2 Operator's Manual page 24

Table of Contents

Advertisement

3. Using the straight edge and ruler or a combination
square as shown, measure from the table top to the
top of the rail and allow for a 9/16" (14.28mm) gap
between the bottom of the straightedge and the top
of the rail. This will provide for the proper clearance
of the T-slot for the miter gauge as well as the
clearance for the bottom of the fence to the top of
the table.
4. Hold the rail in this position and fully tighten the
fasteners.
5. Check to make sure the top edge of front rail allow
the miter gauge to slide smoothly when installed.
6. On the left end of the table, loosen the mounting
bolt and remove the nut and washer (A).
7. Install the switch assembly onto the bolt and install
the washer and nut hand tight.
8. Locate the stiffener brace. Loosen the socket head
cap screw (B) and slide the slotted end of the brace
between the washer and the cabinet.
9. Remove the nut on the lower switch mount and
install the brace onto the screw.
10. Align the switch and the brace to be evenly
positioned and tighten all three fasteners.
11. Install the rear rail by working from the right end of
the table toward the left and loosely install the
mounting screws to support and align the rear rail
using the 1/4" hex head screws and hardware.
B
21
21
A
C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ts-1040p-50-v2

Table of Contents