COmmISSIONING

26
Commissioning
All the following tasks have to be carried out chronologically before commissioning.
After these have been carried out the machine will be ready for commissioning.

Cleaning the Machine

All bright machine parts are coated with a rust preventing agent. Generally this coat
will be washed off by the coolant during the operation of the machine.
When cleaning the machine some of the solvent might splash
into the eyes. Protect your eyes by wearing suitable safety
goggles.
Protect your hands and arms by wearing long sleeve clothing
and gloves when cleaning the machine.
Risk of bodily injury by sharp edged machine parts and tools!
The rust preventing agent must be washed of manually when the machine is put
into operation after a longer period and when the rust agent has become very
tough.
Mounting surfaces for toolholders and attachments must be cleaned in any case.
For this purpose only agents that do not attack the machine paint may be used.
Suitable are turpentine, paraffin (kerosene) or benzine.

Checking supplies, restocking

Hydraulic system: ......................................................... Check oil level
Coolant system: ........................................................... Fill coolant tank
Central lubrication system: .......................................... Check oil level
Attachments: ................................................................ Check oil level
For notes on the quality of media, such as lubricating oil, hydraulic oil
and coolant, as well as on capacity of tanks and charging holes, see
chapter "Service and Maintenance" and machine installation diagram
in the chapter "Working Data".

Pressure accumulator

When the machine has been transported as airfreight all attached pressure accumu-
lators will be depressurized.
Before commissioning all pressure accumulators must be charged with nitrogen (N
by a specialist. Observe the recommended pressures.
For recommended pressures see "Hydraulic diagrams" in the chapter "Working data".
Transportation, Installation, Commissioning
LL1602.10043 - 04.08.2014
)