Maximum Output Calibration - Watts AERCO Modulex EXT Commercial Series User Manual

Hide thumbs Also See for AERCO Modulex EXT Commercial Series:
Table of Contents

Advertisement

Modulex EXT Commercial Series Boilers User Manual
CHAPTER 4: Installation Instructions
REAR
BOILER
TOP VIEW
FRONT
B
Minimum
Output Adjust
Maximum
Output Adjust
A
Figure 4-28: Location of Minimum and Maximum Adjustments (Top View)

4.33.2 Maximum Output Calibration

After installing the gas analyzer probe (Figure 4-27), refer to Figure 4-28 to locate the gas
valves and the Maximum Gas Adjustment screw (A) on each valve. Follow the instructions
below to set the maximum gas output level for each valve.
Adjusting the Maximum (A) Gas Output Setting
1. Remove the cap of the combustion gases sampling point (Figure 4-27) and connect a
suitable gas analyzer.
2. Operate the burner to a minimum power following the procedure described in Section 4.34
(Figure 4-30) ''Sweeper'' function (CASCADE MAN 100%).
3. Check that the CO
2
4. If necessary correct the value by turning the adjustment screw "A" in a CLOCKWISE
direction to decrease the value or ANTICLOCKWISE to increase the value.
5. Repeat the adjustment for all gas valves in the boiler.
Page 66 of 144
09/15/2017
values are within the values indicated in Table 4-6, below.
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Phone: 800-526-0288
B
A
OMM-0095_0H
GF-139