Modulex EXT Commercial Series Boilers User Manual
CHAPTER 4: Installation Instructions
4. To prepare the boiler for lifting by the hoist, remove panel covers from front, rear, right, left
and top (Panel 6).
5. Use the four hoist straps (Panel 5) as slings and place one under each of four boiler legs
ensuring that strap is located UNDER the cross bars of the frame as shown in Panel 6.
6. Ensure belts are placed correctly on all four boiler legs before attempting to lift it.

4.6 BOILER PACKAGE CONTENTS

In the packaging, in addition to the boiler, you will also find the following contents:
ON THE LEFT HAND SIDE OF BOILER (UNDER PANEL)
CSD-1 manifold.
CARDBOARD BOX #1
Gasket between exhaust manifold and adaptor
Four (4) piping elbows, a piping tee, and plastic plug
for condensate draining system
Hardware for assembling exhaust manifold
Three (3) sensors:
o Remote temperature sensor
o DHW Storage tank sensor
o Outdoor temerature sensor
Electrical resistor kit for emergency operation
Combustion sampling port for the flue
Metal plate and cable for power output
CARDBOARD BOX #2
European-to-USA vent adaptor
Two (2) gaskets for air intake and exhaust
connections
One (1) 300 mm diameter gasket
INSIDE CASING ON THE BACK OF THE BOILER
Two (2) pipes, each 39.3 feet (1 m) long for the
condensate draining system
ABOVE THE TOP COVER OF THE BOILER
A plastic bag containing:
o This installation and user manual for the installer.
o E8 controller instruction manual.
IN A SEPARATE BOX
Air intake adaptor for spiral ducting only
Temperature & Pressure gauge
Flow Switch
Pipe adaptor (rubber)
Page 28 of 144
09/15/2017
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913