Main PCB (PCB1) on the upper layer
1. Loosen the screws and
remove the top panel and
service panel.
2. Unlatch the cover and remove
the cover of control box.
3. Disconnect the connector
of CNFAN.
Note: Be sure to do following
work after elapsing 3
minutes from power
OFF.
4. Loosen 6 screws and lift
up the main PCB.
〔Top view〕
〔Front view〕
〔Top view of PCB after removing the cover〕
Screws
Screws
〔Side view after lifting〕
289
-
-
'17 • SCM-T-225
2 Latches on front side
2 more Latches on rear side
Totally 4 Latches
Disconnect the connector
of CNFAN.