Mouvex CC8-40 AP Installation Operation & Maintenance

Mouvex CC8-40 AP Installation Operation & Maintenance

Construction a with pushrods

Advertisement

Quick Links

CC8-40 AP - CC8-50 AP pumps
CC8 Series pumps are covered 24 months by warranty within the limits mentioned in our General Sales Conditions.
In case of a use other than that mentioned in the Instructions manual, and without preliminary agreement of MOUVEX,
warranty will be canceled.
Z.I. La Plaine des Isles - F 89000 AUXERRE - FRANCE
Tel. : +33 (0)3.86.49.86.30 - Fax : +33 (0)3.86.49.87.17
contact@mouvex.com - www.mouvex.com
Construction A with pushrods
WARRANTY :
INSTRUCTIONS 1010-E00 e
Section
1010
Effective
March 2018
Replaces
July 2017
Original instructions
INSTALLATION
OPERATION
MAINTENANCE
Your distributor :

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CC8-40 AP and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Mouvex CC8-40 AP

  • Page 1 CC8 Series pumps are covered 24 months by warranty within the limits mentioned in our General Sales Conditions. In case of a use other than that mentioned in the Instructions manual, and without preliminary agreement of MOUVEX, warranty will be canceled.
  • Page 2: Table Of Contents

    18. SCRAPPING ....... . .18 19. CERTIFICATE OF CONFORMITY ....19 NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 2/19...
  • Page 3: Presentation

    When requested, they can be delivered with a 8 bar spring adjusted at the maximum pressure of use. Temperature range allowed : -20°C à +80°C Products authorised : Contact us NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 3/19...
  • Page 4: Overall Dimensions

    3. OVERALL DIMENSIONS NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 4/19...
  • Page 5: Installation

    NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 5/19...
  • Page 6: Bypass Setting

    • Tight the nut. • Check on the installation the pump gives the right pres- sure (using a manometer) with a closed valve on the discharge line. NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 6/19...
  • Page 7: Direct Drive By Motor

    REMINDER : You cannot rely on the coupling to compensate for mis- alignment. NEVER START A UNIT IF THE COUPLING ALIGNMENT IS INCORRECT. THIS WILL RENDER OUR WARRANTY INVALID. NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 7/19...
  • Page 8: Electric Motors

    TY DAMAGE OR DEATH. Do not operate without guard in place. 6. DRIVE BY POWER TAKE OFF Refer to Instructions NT 1010-B00 CC8 CC10 CC20 PUMPS RIVEN BY POWER TAKE OFF NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 8/19...
  • Page 9: Use

    In the case of liquids containing particles settling on shut-down, it is necessary to make sure the consistency of the deposit will not impede restarting the pump. NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 9/19...
  • Page 10: Protection From Frost

    • Stop the pump and make sure no liquid is coming back > pump has to be closed. Step 2 : • Defect or in complement, drain by the bottom plug. Drain plug NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 10/19...
  • Page 11: Necessary Tools

    Before any dismantling, make sure that the pump has been drained and take all the necessary precautions to prevent it from star- ting up. The pump must not start up, even accidentally. NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 11/19...
  • Page 12: Dismantling On Side Opposite To Drive System

    Screw up the 2 screws at the same time so that the end- plate is gradually released along the centre line. When the end-plate is free on the shaft, hold it by hand supporting it. NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 12/19...
  • Page 13: Reassembly Of The Pump

    Refit the vanes (new if necessary) respecting the direction of assembly. Reassemble the pump and check that it rotates freely when turned by hand. NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 13/19...
  • Page 14: Inspection Of The Pushrods

    101. Re-fit the end plate on the non-drive side (see § REASSEMBLY OF THE PUMP). Check that the pump rotates freely when turned by hand. NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 14/19...
  • Page 15: Changing Monobloc Shaft Seal

    Clean all parts before reassembly. Reassemble in reverse order of dismantling. Set bypass at initial pressure setting by tightening nut with the same number of rotations as counted during dismounting. NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 15/19...
  • Page 16: Maintenance

    Change when "h" < to 31,0 29,0 CC8-40 31,0 29,0 CC8-50 DIMENSIONS OF THE PUSHRODS - mm Pump Original lenght "L" Change when "L" < to 82,5 82,0 CC8-40 85,0 84,5 CC8-50 NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 16/19...
  • Page 17: Troubleshooting

    - Pump damaged (see § Abnormal noise - Pump damaged due to passage of foreign matter). • Bypass valve hammer on its seat due to incorrect adjustment of the spring’s tension. NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 17/19...
  • Page 18: Storage

    The pump must be scrapped in compliance with the regulations During this operation, particular care must be paid to the drai- in force. nage stages of the pump (pumped product). NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 18/19...
  • Page 19: Certificate Of Conformity

    19. CERTIFICATE OF CONFORMITY NT 1010-E00 03 18 CC8-40 AP - CC8-50 AP pumps e 19/19...

This manual is also suitable for:

Cc8-50 ap

Table of Contents