7 Bringing the pellet boiler into the central heating room

7
Bringing the pellet boiler into the central heating room
This section describes the prerequisites as well as the working sequence required.
1.
2.
3.
4. Dismantling the casing parts
7.1
Maine Energy Systems supplies the pellet boiler on a pallet. The pellet boiler is ready
to be connected.
The control unit for the boiler controller is integrated into the control panel.
If it is not possible to bring the boiler into the building at ground level, remove the
casing, the burner, the boiler controller and the pellet hopper. This will reduce the
weight of the unit and make it easier to carry.
Tighten the hydraulic connections firmly on site and carry out a density test.
NOTICE
Contamination and corrosion
Make sure that the pellet boiler is located under a roof if it needs to be stored outside
before it is transported/ brought into the building.
7.2
Make sure that the pellet boiler is located under a roof if it needs to be stored outside
before it is transported/brought into the building.

Transport

Notes on bringing the unit into the building

Casing parts
Transport
Notes on bringing the unit into the building
Minimum door width — max. unit dimension
Easypell 16 / 20
Easypell 25 / 32
16 – 20 kW
25 – 32 kW
677 mm
724 mm
Installation Manual
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Easypell 16Easypell 20Easypell 25Easypell 32

Table of Contents