11 Starting up for the first time

11
Starting up for the first time
After bringing in the boiler, connecting up the hydraulics and power supply, the unit
can be started up for the first time.
NOTICE
Density of the combustion chamber
To ensure a trouble-free operation, the density of the combustion chamber must be
given.
The unit must be started up for the first time by an authorised Eco Engineering serv-
ice technician.
NOTICE
Material Damage
The allowed operation temperature of the boiler controller is between 5 and 40° C.
NOTICE
Emission measurement
Before carrying out an emission measurement, the pellet boiler must have a minimum
running time of 30 hours.