Removing The Casing, The Hopper And The Burner - Eco Engineering Easypell Installation Manual

Hide thumbs Also See for Easypell:
Table of Contents

Advertisement

20
7.4
Dismantle the pellet boiler as far as necessary if site conditions require, so that the
unit can be brought safely into the building.
The complete dismantling of all components described here is divided into the follow-
ing sections:
1.
2.
3.
Installation Manual
1
6.1
1
Pellet hopper casing cover
2
Boiler casing cover
3
Boiler side panel
4
Front of boiler

Removing the casing, the hopper and the burner

Dismantling the burner casing and the burner
Dismantling the boiler door
Dismantling the boiler casing
7 Bringing the pellet boiler into the central heating room
7
6
5
Boiler door
6
Pellet hopper casing
6.1
Cover pellet hopper casing
7
Boiler rear panel
2
3
4
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Easypell 16Easypell 20Easypell 25Easypell 32

Table of Contents