26
Number of cleaning springs (tubulators) to be removed/installed:
Only the adjustment of the system by an authorized Eco Engineering service techni-
cian can guarantee an optimal level of efficiency and with that a low-emission opera-
tion.
Starting up for the first time has to be performed only by an authorized Eco Engi-
neering service technician.
Installation Manual
Boiler power rat-
Factory-set boiler
ings as per data
power rating
plate
16 kW
16 kW
20 kW
16 kW
25 kW
25 kW
32 kW
25 kW
8 Performance adjustment
No adjustment required
Insert another 4 turbulators
No adjustment required
Insert another 4 turbulators