Connecting Up The Hydraulics - Eco Engineering Easypell Installation Manual

Hide thumbs Also See for Easypell:
Table of Contents

Advertisement

9 Connecting up the hydraulics

9
Connecting up the hydraulics
The hydraulic connections are located on the top side of the boiler.
Risk of explosion
You may connect up the pellet boiler only after an authorised plumber has installed
the hydraulic system completely with all safety devices.
NOTICE
Water damage, damage to pellet boiler
Only an authorised plumber may connect up hydraulics on the pellet boiler. Check the
hydraulic system for leaks before starting up.
NOTICE
Insulation
The flow and return pipes must be insulated according to the state of the art.
1.
2.
3.
DANGER
Hydraulic schematics
Always refer to the Eco Engineering hydraulic schematics when connecting up
the pellet boiler. The Eco Engineering hydraulic schematics are available from
your Eco Engineering sales partner or from the Eco Engineering website.
Connections
The connections between the pellet boiler and the hydraulic system must be dis-
connectable.
Drain connection
When you install the pellet boiler, remove the plug from the ENTLEERUNG con-
nection and fit a 1/2" diameter shut-off valve.
27
Installation Manual

Advertisement

Table of Contents
loading

Related Products for Eco Engineering Easypell

This manual is also suitable for:

Easypell 16Easypell 20Easypell 25Easypell 32

Table of Contents