Eco Engineering Easypell Installation Manual page 44

Hide thumbs Also See for Easypell:
Table of Contents

Advertisement

44
Installation Manual
13 Controller for heating circuits and DHW
Adjusting the time programme of the boiler.
By pressing
the start and stoptime appear.
Activate the times with
In the activated time, the boiler always runs up to
the switch-off temperature without considering the
contact Z26. Outside the time, the contact Z26
activates the boiler.
Setting Outertemperature control.
Here you can set the temperature values for the
maximum and minimum boiler rating.
Adjustment range max. rated power -10° C bis +6°
C
Adjustment range min. power +7° C bis +25° C
Setting boiler rated power.
Enter the desired rated output of the boiler to
make a more accurate setting. This will improve
boiler runtime and modulation.
Settings pumptype:
Z16/38
Heating efficient with or without PWM1 - PWM
signal heating
Asynchronus pump – direct output 230VAC
on/off
Heating efficient PWM 2 – PWM signal solar

Advertisement

Table of Contents
loading

Related Products for Eco Engineering Easypell

This manual is also suitable for:

Easypell 16Easypell 20Easypell 25Easypell 32

Table of Contents