www.ti.com
2
Features
•
Adjustable Transmit VOD: 600 to 1300 mVp-p
•
Settable Transmit De-emphasis Driver to -12 dB
•
Low Power Consumption: 200 mW/Channel
•
Locks to Half/Quarter/Eighth Data Rates for Legacy Support
•
On-chip Eye Monitor (EOM), PRBS Generator
3
Applications
•
Front Port Optical Interconnects
•
SFF-8431
•
10G/1G Ethernet
•
CPRI
4
Ordering Information
EVM ID
DS125DF111EVM
SNLU158A – January 2014 – Revised January 2016
Submit Documentation Feedback
DEVICE ID
DS125DF111SQ
Copyright © 2014–2016, Texas Instruments Incorporated
DEVICE PACKAGE
24WQFN
DS125DF111EVM Evaluation Board
Features
5
Need help?
Do you have a question about the DS125DF111EVM and is the answer not in the manual?