Unpacking The Boxes; Obtaining Additional Equipment And Tools - NetApp StorageGRID SG1000 Hardware Installation And Maintenance Manual

Hide thumbs Also See for StorageGRID SG1000:
Table of Contents

Advertisement

Unpacking the boxes

Before installing the StorageGRID appliance, unpack all boxes and compare the contents to the items
on the packing slip.
SG1000 hardware
Power cords
The shipment for the StorageGRID appliance includes the following power cords:
Your cabinet might have special power cords that you use instead of the power cords that ship with

Obtaining additional equipment and tools

Before installing the StorageGRID appliance, confirm you have all of the additional equipment and
tools that you need.
You need the following additional equipment to install and configure the hardware:
Phillips No. 2 screwdriver
Medium flat-blade screwdriver
SG1000
Two power cords for your country
the appliance.
Preparing for installation | 11
Rail kit with instructions
ESD wrist strap

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the StorageGRID SG1000 and is the answer not in the manual?

Table of Contents