Backyard Products GABLE 10 x 8 Assembly Manual

Backyard Products GABLE 10 x 8 Assembly Manual

305 x 244 cm

Advertisement

For questions on assembly or for general inquiries, you may contact us in the following ways:
Call a Recruiter Today! 734-365-7000
Flexible schedule
*based on number of completed installations
STOP!
Call Us First!
DO NOT RETURN TO STORE.
Call customer service: 1-877-743-3400
AVOID THE WAIT!
visit us online at
help.backyardproducts.com
Submit a help request
Answers to frequently asked questions
Live chat with an agent
Did you enjoy building your shed?
JOIN OUR TEAM
AND MAKE UP TO $1,500/WEEK*
No selling,
just building
Bonus incentives
available
16587-A

Advertisement

Table of Contents
loading

Summary of Contents for Backyard Products GABLE 10 x 8

  • Page 1 16587-A STOP! Call Us First! DO NOT RETURN TO STORE. For questions on assembly or for general inquiries, you may contact us in the following ways: Call customer service: 1-877-743-3400 AVOID THE WAIT! visit us online at help.backyardproducts.com Submit a help request Answers to frequently asked questions Live chat with an agent Did you enjoy building your shed?
  • Page 2 $500 gift card. Write a Backyard Products, LLC. product review at backyardreviews.net for a chance to win a $500 Visa gift card. No purchase necessary to enter. Must be legal U.S. resident (including DC & Puerto Rico), 18 or older to participate. Taxes on prize are responsibility of winner. Odds of winning depend on the number...
  • Page 3: Assembly Manual

    16587-A 12/13/2021 Backyard Products, LLC ASSEMBLY MANUAL 1000 Ternes Drive Monroe, MI 48162 GABLE 10' x 8' (305 x 244 cm) ACTUAL FLOOR SIZE IS 116-1/2 x 96" (295,9 x 243,8 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE IMPORTA NT ! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
  • Page 4 TOOLS Required Optional ❑ Chalk Line ❑ Phillips ❑ Tool Belt/ Screwdriver Nail Pouch ❑ Drill / Driver ❑ Utility Knife ❑ Shingle ❑ Safety Glasses ❑ 3/8" Drill Bit Blades ❑ #2 Philips Drive Bit ❑ Hammer ❑ Caulk Gun ❑...
  • Page 5: Additional Materials

    ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed kit includes a wood floor frame, it does not include floor panels. • This shed does not include any leveling materials. • See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site.
  • Page 6: Parts List

    PARTS IDENTIFICATION AND SIZES Part identification is WOOD SIZE CONVERSION CHART stamped on some parts. Nominal Board Size Actual Size 2" x 4"....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1" x 4"....3/4" x 3-1/2" (1,9 x 8,9 cm) 2" x 3"....1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1"...
  • Page 7: Right Door

    WALL PANEL & DOOR PARTS LIST NOTE: Panel parts are not stamped with part identification. 3/8 x 23-7/8 x 72" (1 x 60,6 x 182,9 cm) 3/8 x 48 x 72" 3/8 x 12-1/2 x 72" 3/8 x 46-1/8 x 72" 3/8 x 48 x 72"...
  • Page 8 FLOOR PANELS (Not Included) You will need fl r panels to complete your floor. • Floor panel sizes and quantities shown below. NOTE: Use a minimum of 5/8" (1,6 cm) oriented strand board (OSB). 20-1/2 x 96" (60,6 x 243,8 cm) 48 x 96"...
  • Page 9 WINDOW & DOOR HARDWARE (Not actual size) 56" (142,2 cm) METAL THRESHOLD 3/4" (1,9 cm) Bagged separately - special coating 1-1/2" (3,8 cm) 1-1/2" (3,8 cm) 3/4" (1,9 cm) FASTENER/HARDWARE BAG 1-1/2" (3,8 cm) 2" (5,1 cm) 3" (7,6 cm) 2"...
  • Page 10 BUILDING ANATOMY All of our buildings have been engineered to withstand demanding wind and snow loads. If you live in an area with extreme wind/snow load requirement, contact us and we can assist with engineering to meet your local codes. 1.
  • Page 11 FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS • 3" (7,6 cm) Screws angled into 4x4. •...
  • Page 12 CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kiton a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. 3-1/2" (8,9 cm) 4" (10,2 cm) Building Size Actual Size...
  • Page 13 FLOOR FRAME FLOOR FRAME LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. ¸ BEGIN See page 9 for the preferred floor leveling method. Use level and check the frame is level before applying floor panels.
  • Page 14 FLOOR FRAME FLOOR FRAME PARTS REQUIRED: x 28 3" (7,6 cm) TREATED 2 x 4 x 24" (5,1 x 10,2 x 61 cm) TREATED NOTE: Look for 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm) TREATED TREATED Stamp 2 x 4 x 92-1/2"...
  • Page 15: Parts Required

    FLOOR FLOOR PARTS REQUIRED: 2" (5,1 cm) 5/8 x 48 x 96" (1,6 x 121,9 x 243,8 cm) Ensure your floor frame is square by installing one panel and squaring frame. ¸ BEGIN Attach the 48 x 96" (121,9 x 243,8 cm) panel with the rough side up (painted-grid lines side) with the 48"...
  • Page 16 FLOOR PANELS FLOOR PANELS PARTS REQUIRED: 2" (5,1 cm) 5/8 x 48 x 96" 5/8 x 20-1/2 x 96" (1,6 x 121,9 x 243,8 cm) (1,6 x 52,1 x 243,8 cm) Continue installing panels with rough side up (painted grid lines). Use a chalk line or grid lines on panel for 2"...
  • Page 17 IMPORTANT! Check the floor frame is level after installing floor panels. Re-level if needed. • The floor should be used as a level work surface for wall construction. • Organize your wall sections during sub-assembly HINT: to avoid over-handling of the walls. Side wall Back Wall Front wall...
  • Page 18 SIDE WALL FRAMES PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) Build (2) identical side walls. ¸ BEGIN Arrange parts on floor as shown. Secure with (2) 3"...
  • Page 19 SIDE WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 3/8 x 48 x 72 BLOCK (1 x 121,9 x 182,9 cm) Install all panels with the primed side facing up. Ensure your wall frame is square by installing one panel and squaring the frame. Place (1) 46-1/8"...
  • Page 20 SIDE WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/8 x 48 x 72 (1 x 121,9 x 182,9 cm) Install 2nd 48" x 72" panel flush to installed panel. Secure panels 2" nails spaced 6" apart on edges and 12" apart inside. Repeat steps 2 - 5 to install panels on your 2nd side wall frame.
  • Page 21 BACK WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 42-3/4" (5,1 x 10,2 x 108,6 cm) 2 x 4 x 66-3/4" (5,1 x 10,2 x 169,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) ¸...
  • Page 22 BACK WALL PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 72 (1 x 121,9 x 182,9 cm) Install all panels with the primed side facing up. Ensure your wall frame is square by installing one panel and squaring the frame. Place (1) 46-1/8"...
  • Page 23 BACK WALL PARTS REQUIRED: 2" (5,1 cm) 3/8 x 48 x 72 3/8 x 23-7/8 x 72" (1 x 60,6 x 182,9 cm) (1 x 121,9 x 182,9 cm) Install 23-7/8" x 72" panel flush to installed panel. Secure with 2" nails spaced 6" apart. For squareness maintain flush along panel edges.
  • Page 24 FRONT WALL FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 9" (5,1 x 10,2 x 22,9 cm) 2 x 4 x 29" (5,1 x 10,2 x 73,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 44-1/2"...
  • Page 25 FRONT WALL PANELS PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) Temporary Brace 69" (175,3) Door Stiffener 3/8 x 48 x 72" (1 x 121,9 x 182,9 cm) 3/8 x 12-1/2 x 72" (1 x 31,8 x 182,9 cm) Install all panels with the primed side facing up. Install (1) 48"...
  • Page 26: Front Wall

    FRONT WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 17" (5,1 x 10,2 x 43,2 cm) 2" (5,1 cm) Place (2) CCA on edge flush to window opening. Secure to frame with (8) 3" nails (Fig A). 1-1/2" (3,8 cm) Flush CCA (2) 3"...
  • Page 27 BACK / FRONT WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 3" (7,6 cm) 2" (5,1 cm) 2 x 4 x 54-1/8" (5,1 x 10,2 x 137,5 cm) Back Wall BEGIN Center back wall assembly on the 116-1/2" (295,9 cm) floor dimension. Install rafter NPE as a temporary brace.
  • Page 28 SIDE WALLS INSTALLATION PARTS REQUIRED: PARTS REQUIRED: 2" (5,1 cm) 1-1/2" (3,8 cm) 3" (7,6 cm) 3" (7,6 cm) Right Wall BEGIN Center right side wall on floor. Secure the lower side wall corner to the back wall stud with (1) 1-1/2" nail (Fig A). Ensure the measurement between the panel edges are the same along the corner.
  • Page 29: End View

    WALL DOUBLERS PARTS REQUIRED: 3" (7,6 cm) 2 x 6 x 21-1/4" (5,1 x 15,2 x 54 cm) 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) BEGIN Install parts flush to inside of front and back top plates (Fig. A) and flush to wall panels (Fig.
  • Page 30 RAFTERS PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) 6 x 24" (15,2 x 61 cm) Temporary Part 2 x 4 x 14-13/16" (5,1 x 10,2 x 37,6 cm) 2 x 4 x 54-1/8" (5,1 x 10,2 x 137,5 cm) ¸...
  • Page 31: Front View

    RAFTER INSTALLATION PARTS REQUIRED: 3" (7,6 cm) BEGIN Mark doubler to measurements shown. Locate rafters centered on marks. Secure rafters in position with (2) 3" screws at each connection (Fig. A). Drive screw through top plate into doubler (Fig. B). Dimensions are from outside of wall panels Dimensions are to...
  • Page 32 GABLE UNITS PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 4 x 14-13/16" (5,1 x 10,2 x 37,6 cm) Assemble (2) gable units. Install gable panels with primed side up. BEGIN Arrange parts flat on floor to measurements shown. Measure and mark center of gable panel. Secure center gable panel to (2) CBA with 1-1/2"...
  • Page 33 GABLE UNIT INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) BEGIN Center gable assembly on side wall with mark. Ensure gable connectors CBA are sitting flush on top of frame. Panels should be flush to doublers, as shown (Fig. A, B). Secure panel to top plate with 2"...
  • Page 34 GABLE TRIM INSTALLATION PARTS REQUIRED: 1-1/4" (3,2 cm) 2 x 4 x 56" (5,1 x 10,2 x 142,2 cm) BEGIN Install (1) gable trim MCB flush along top of panel and with end flush to center mark (Fig. A). Secure trim to gable unit panels with 1-1/4" screws spaced 6" apart. Screw through panels into gable trim.
  • Page 35 FASCIA TRIM PARTS REQUIRED: 2" (5,1 cm) 2 x 3 x 22" (5,1 x 7,6 x 55,9 cm) 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) ¸ BEGIN Place parts flush to bottom of doubler, as shown (Fig. A). Secure with 2"...
  • Page 36 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 8-1/2 x 96” 7/16 x 8-1/2x 23-7/8” (1,1 x 21,6 x 243,8 cm) (1,1 x 21,6 x 60,6 cm) 7/16 x 23-7/8 x 48” 3/4" GAUGE 7/16 x 48 x 96” (1,1 x 60,6 x 121,9 cm) BLOCK (1,1 x 121,9 x 243,8 cm)
  • Page 37 ROOF PANELS PARTS REQUIRED: x130 2" (5,1 cm) 3/4" GAUGE BLOCK Maintain spacing between the center of the rafters (Fig. E). Secure top of panels with (1) 2" nail Fig. E into each rafter. Measurements are from Move to the bottom and secure panels outside of trim.
  • Page 38: Door Opening

    DOOR SUPPORT PARTS REQUIRED: 2" (5,1 cm) 5/8 x 3 x 96" (1,6 x 7,6 x 244 cm) ¸ BEGIN Install 3" x 96" support flush with bottom edge of top plate and side wall frame. Secure with 2" nails, as shown. 6"...
  • Page 39 DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/4" (3,2 cm) 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) 69" (175,3 cm) Door Stiffener Left Door Right Door BEGIN Place doors on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.
  • Page 40 DOORS PARTS REQUIRED: 3" (7,6 cm) Temporary Support 69" (175,3) Door Stiffener 2" (5,1 cm) Attach temporary support OO as a ledger board flush under wall panels for doors to rest on, with (2) 3" screws (Fig. A). 28" (71,1 cm) Center 56"...
  • Page 41 DOOR TRIM & THRESHOLD PARTS REQUIRED: 3/4" (1,9 cm) 56" (142,2 cm) METAL THRESHOLD 3/4" (1,9 cm) Bagged separately/ special coating BEGIN Reinforce the door trim with 3/4" screws through door panel into trim (Fig, A). Locate screws as shown in Fig. B. Use (2) screws at seams. Center metal threshold between doors and secure with (10) 3/4"...
  • Page 42 DOOR WEATHERSTRIPS PARTS REQUIRED: 2" 5,1 cm) 69" (175,3) Door Stiffener BEGIN With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig A). OO will offset the left door 1" (2,5 cm) OUT past the door trim (Fig B). Secure OO with (7) 2"...
  • Page 43: Door Hardware

    DOOR HARDWARE PARTS REQUIRED: 5/16" (0,8 cm) Drill Bit 1" (2,5 cm) BEGIN Place bolts onto OO in open position with bolt ends 3/8" (1 cm) down from frame. Bolt is open when loop is contacting base (Fig A). Mark and pre-drill holes for screws. Install bolt with screws supplied and drill 5/16"...
  • Page 44: Top View

    DOOR HARDWARE PARTS REQUIRED: 1-1/2" (3,8 cm) 1/4" (0,6 cm) 1/2" (1,3 cm) Drill Bits BEGIN Measure and mark location of hole on outside of right door, as shown. Pre-drill pilot hole with 1/4" dril. Pre-drill through hole with 1/2" drill. Drill hole square to trim to avoid breaking edge of door stiffener.
  • Page 45 COLLAR TIES PARTS REQUIRED: 2" (5,1 cm) 1 x 4 x 60" (2,5 x 10,2 x 152,4 cm) ¸ BEGIN Install (2) collar ties JF on the two center rafters above the door. Ensure collar ties are level and flush to roof panels. Secure collar ties to rafter with three 2"...
  • Page 46 CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8 x 1-3/4 x 72" (1 x 4,4 x 182,9 cm) ¸ BEGIN Place parts under fascia trim and flush to gable panel cutouts (Fig.A). Secure with 2" finish nails 10" (25,4 cm) apart. Fig.
  • Page 47 WINDOW SHUTTERS PARTS REQUIRED: 1" (2,5 cm) 19/32 x 2-1/2 x 22-1/2" (1,5 x 6,4 x 63,5 cm) 19/32 x 2-1/2 x 8" (1,5 x 6,4 x 20 cm) Build (2) identical shutters. ¸ BEGIN Arrange parts primed side-down on floor, as shown. Flush ends of FF.
  • Page 48 WINDOW & SHUTTER INSTALLATION PARTS REQUIRED: 1-1/4" (3,2 cm) ¸ BEGIN Seal window with high-quality exterior-grade caulk. Install and secure window with (4) 1-1/4" screws, as shown. Mark center of window frame. CENTER HINT: Caulk behind frame near edge before installing.
  • Page 49 WINDOW SHUTTERS PARTS REQUIRED: 2" (5,1 cm) 3/4" (1,9 cm) 19/32 x 2-1/2 x 22-5/8" (1,5 x 6,4 x 57,5 cm) Locate one shutter centered on marks as shown. Fasten shutter with (1) 2" finish nail at "dot". (Nail into wall frame inside.) Working from INSIDE of the shed, secure the shutter Mark 8-13/16"...
  • Page 50 PAINT & CAULK - NOT INCLUDED - PARTS REQUIRED: • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: •...
  • Page 51 SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/ 2" 1" 1" Sealing Stri (1, 3 cm) (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
  • Page 52 SHINGLES continued... Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck LEFT SIDE OF RIGHT SIDE SHED OF SHED 1" (2,5 cm) Flush with starter row. Notch - or - Drip Edge...
  • Page 53 SHINGLES continued... Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. 5"...
  • Page 54 SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles into THREE pieces. Hint: Use cut-off pieces first. 2" 2" (5,1 cm) (5,1 cm) 2" 2" 2"...
  • Page 55 SHINGLES - RIDGE CAP continued... roof Continue installing ridge cap to back of Make sure there is 4" (10,2 cm) between the shingle-color and edge of shingles. 4" (10,2 cm) Trim cap off flush to shingles roof When you have 4" minimum of shingle color cut one piece to cap your Cut at top of rain slot.
  • Page 56 16587-A 10' x 8' Order Form CATEGORY PART DESCRIPTION PART SIZE PART ITEM # BUILDING QTY. PART ID Fascia "A" LUM SPF 2X3X96 #2&BTR 12115 2 X 3 Fascia "B" 2 X 3 X 22" TOP PLATE Q 22000000000 Gable Trim 2 X 4 X 56"...
  • Page 57 WARRANTY REGISTRATION Please complete your warranty registration to properly validate your warranty. Register your product online at:www.OnlineWarranty.net. LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: Every product is warranted from defects in workmanship and manufacturing for 1 year. All accessories, hardware and metal components are warranted for 2 years.

Table of Contents