Download Print this page
Backyard Products Yardline AUBURN GABLE Manual
Backyard Products Yardline AUBURN GABLE Manual

Backyard Products Yardline AUBURN GABLE Manual

8' x 8' (243,8 x 243,8 cm)

Advertisement

Quick Links

16552
STOP!
STOP!
Call Us First!
DO NOT RETURN TO STORE.
For immediate help with assembly or product information
call our toll free number:
1-800-844-9273
or email:
customerservice@yardline.net
Our staff is ready to provide assistance
April through October M-F 8:00 AM to 4:30 PM EST
Saturday 8:30 AM to 4:30 PM EST
November through March M - F 8:00 AM to 5:00 PM EST

Advertisement

loading

Summary of Contents for Backyard Products Yardline AUBURN GABLE

  • Page 1 16552 STOP! STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@yardline.net Our staff is ready to provide assistance April through October M-F 8:00 AM to 4:30 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST...
  • Page 2 (This page intentionally left blank.)
  • Page 3: Before You Begin

    16552 1/2/2018 A Backyard Products Company AUBURN GABLE 8' x 8' (243,8 x 243,8 cm) ACTUAL FLOOR SIZE IS 96 x 96" (243,8 x 243,8 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE IMPORTAN T ! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
  • Page 4 TOOLS Required Optional Phillips ❑ Tool Belt/ ❑ Utility Knife ❑ Screwdriver Nail Pouch Shingle Blades ❑ Drill / Driver ❑ Caulk Gun ❑ 1/8" Drill Bit ❑ Tin Snips ❑ 1/4" Drill Bit ❑ (for drip edge) 5/16" Drill Bit ❑...
  • Page 5: Additional Materials

    ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed does not include any floor or leveling materials. • See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. WOOD FLOOR FRAME MATERIAL REQUIRED: Use only wood treated for ground contact and fasteners approved for use with treated wood.
  • Page 6: Parts List

    PARTS IDENTIFICATION AND SIZES Part identification WOOD SIZE CONVERSION CHART letters are stamped on some parts. Nominal Board Size Actual Size 2" x 4"....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1" x 4"....3/4" x 3-1/2" (1,9 x 8,9 cm) 2" x 3"....1-1/2" x 2-1/2" (3,8 x 6,3 cm) Check these locations for 1"...
  • Page 7 PARTS LIST continued... 2 x 3 x10-1/8" (5,1 x 7,6 x 25,7 cm) 1 x 4 x 96" (2,5 x 10,2 x 243,8 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) PANEL PARTS LIST NOTE: Panel parts are not stamped. Roof panels are 7/16"...
  • Page 8 FASTENER/HARDWARE BAG 1-1/2" (3,8 cm) x163 2" (5,1 cm) 3" (7,6 cm) 2" (5,0 cm) 1-5/8" (4,1 cm) 1-1/4" (3,2 cm) 3/4" (1,9 cm) 1" (2,5 cm) 1/2" (1,3 cm) VENT/ DOOR HARDWARE/ WINDOW Handle (locking) with Screws 1" (2,5 cm) 1-1/4”...
  • Page 9 FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS 96" (243,8 cm) • 3" Screw angled into 4x4.
  • Page 10 CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. 3-1/2" (8,9 cm) 4" (10,2 cm) Building Size Actual Size 8' x 8' (243,8 x 243,8 cm) 96"...
  • Page 11: Parts Required

    FLOOR FRAME PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm) Look for TREATED 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) Stamp BEGIN Orient parts as shown on flat surface. Measure and mark. Use two 3"...
  • Page 12 LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN See page 7 for the preferred floor leveling method. Use level and check the frame is level before applying floor panels.
  • Page 13 FLOOR PANELS PARTS REQUIRED: 2" (5,1 cm) 5/8 x 48 x 96" (1,6 x 121,9 x 243,8 cm) Ensure your floor frame is square by installing one panel and squaring frame. BEGIN Attach a 48 x 96" panel with the rough side up (painted-grid lines side) with the 48" edge and corner flush to the floor frame (Fig A).
  • Page 14 FLOOR PANELS PARTS REQUIRED: 2" (5,1 cm) 5/8 x 48 x 96" (1,6 x 121,9 x 243,8 cm) Continue installing 2nd panel using 2" nails 6" apart on edges, and 12" apart inside panels FINISH You have finished attaching your floor panels. Flush Flush Grid lines UP...
  • Page 15 IMPORTANT! Check the floor frame is level after installing floor panels. Re-level if needed. • The floor should be used as a stable work surface for wall construction. • Organize your assembly procedure during the build process HINT: to avoid over-handling of the walls. EAVE SIDE WALL GABLE END WALL...
  • Page 16: Rafter Assembly

    RAFTER ASSEMBLY PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 4-7/8" (5,1 x 10,2 x 12,4 cm) It is very important to assemble your rafters using the following method for an even and flat roof. You will build a rafter jig using the floor and two CLA parts as shown. ¸...
  • Page 17 RAFTER ASSEMBLY PARTS REQUIRED: x 66 2" (5,1 cm) 1-5/8" (4,1 cm) GUSSET 6 x 24" (15,2 x 61 cm) 2 x 4 x 61-7/8" (5,1 x 10,2 x 157,2 cm) ¸ BEGIN Place two rafters CNA into the jig as shown. Keep CNA firm against outside CLA as shown (Fig.A).
  • Page 18 GABLE-END RAFTER ASSEMBLY PARTS REQUIRED: x 20 2" (5,1 cm) 1-5/8" (4,1 cm) GUSSET 6 x 24" (15,2 x 61 cm) 2 x 4 x 61-7/8" (5,1 x 10,2 x 157,2 cm) Gable-end rafter assemblies only have one gusset. Repeat steps 1 through 2 to assemble two more gable-end rafters. 1/4"...
  • Page 19 DOOR HEADER ASSEMBLY PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 51" (3,8 x 8,9 x 129,5 cm) 7/16 x 3 x 51" (1,1 x 7,6 x 129,5 cm) OSB BEGIN Center OSB on top of TCA Glue both sides of OSB Place another TCA on top of OSB.
  • Page 20: Front Wall

    FRONT WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 20-1/2" (5 x 10,2 x 52,1 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 89" (5 x 10,2 x 226,1 cm) 2 x 4 x 68-1/2"...
  • Page 21 FRONT WALL PARTS REQUIRED: 3" (7,6 cm) 3/8 x 3-7/8 x 48" (1 x 9,8 x 121,9 cm) 2" (5,1 cm) 3/8 x 23-7/8 x 76" (1 x 60,6 x 193 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 6,4 x 175,3 cm) Place both 23-7/8 x 76"...
  • Page 22 SIDE WALL FRAMES PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) IMPORTANT! You will build two walls the same. BEGIN Orient parts on edge on floor. Measure and mark from end of boards. Use two 3"...
  • Page 23 SIDE WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" 3/8 x 48 x 76" (1 x 121,9 x 193 cm) GAUGE BLOCK Place panel with primed side up onto frame flush at top and with a 3/4" gap along right side. Maintain 3/4"...
  • Page 24 SIDE WALL PANELS PARTS REQUIRED: 2" (5,1 cm) 3/8 x 48 x 76" (1 x 121,9 x 193 cm) Place 48" panel on frame as shown with primed side facing up flush with first panel. Nail using 2" nails 6" apart on edges and 12" apart inside panel.
  • Page 25 GABLE END WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 72" (5 x 10,2 x 182,9 cm) 2 x 4 x 89" (5 x 10,2 x 226,1 cm) BEGIN Orient parts on edge on floor. Measure and mark. HINT: Use two 3"...
  • Page 26 GABLE END WALL PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 48 x 76" BLOCK (121,9 x 193 cm) Place panel with primed side up onto frame flush at top and with a 3/4" gap along right side. Maintain 3/4" measurement along edge. Secure panel to frame using 2"...
  • Page 27 GABLE END WALL PARTS REQUIRED: 2" (5,1 cm) 48 x 76" (121,9 x 193 cm) Place right panel flush to left panel with primed side up. Secure using 2" (5,1 cm) nails 6" (15,2 cm) apart on edges and 12" (30,5 cm) apart on inside of panel. Flush 3-1/2"...
  • Page 28 RIGHT SIDE WALL INSTALLATION PARTS REQUIRED (TEMPORARY): 3" (7,6 cm) 2 x 3 x 69" (5,1 x 7,6 x 175,3 cm) 3" (7,6 cm) TEMPORARY SUPPORT 2" (5,1 cm) BEGIN Center side wall assembly on the 96" (243,8 cm) floor dimension. Ensure 1"...
  • Page 29 REAR WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 1-1/2" (3,8 cm) 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 2" (3,8 cm) BEGIN Flush Screw Flush Stand wall on floor. STEP FIRST SCREW Fig. A 2" (5,1 cm) Screw Set rear wall on floor and secure top of wall using one 2"...
  • Page 30 LEFT SIDE WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 1-1/2" (3,8 cm) 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) BEGIN Set right wall on floor and secure top of wall using one 2" screw into top plate STEP FIRST (Fig A).
  • Page 31 FRONT WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) BEGIN Remove Temporary Supports and stand gable door wall on floor. Set front door wall on floor and secure using one 2" screw on each side (Fig A). ENSURE TOP WALL FRAMES ARE FLUSH.
  • Page 32 FRONT WALL INSTALLATION PARTS REQUIRED: Nail lower edge of panels to floor using 2" nails 6" apart. Angle nail to hit floor frame (Fig. C). 2" (5,1 cm) Nails 6" (15,2 cm) Angle nail to hit floor frame. 6" (15,2 cm) Fig.
  • Page 33 DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) 1-5/8" (4,1 cm) x1 GAA 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) Left Door Right Door Assembled Assembled ¸ BEGIN Orient parts as shown on flat surface.
  • Page 34 DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) BEGIN Attach temporary support OO as a ledger board flush under wall panels for doors to rest on, using three 3" screws (Fig. A) . Flush against wall panels.
  • Page 35 DOOR PARTS REQUIRED: 3/4" (1,9 cm) x9 2" (5,1 cm) Bagged seperately / special coating 3/4" (1,9 cm) 19/32 x 3 x 19" (1,5 x 7,6 x 48,3 cm) 19/32 x 3 x 55" (1,5 x 7,6 x 139,7 cm) 48"...
  • Page 36 WINDOW PARTS REQUIRED: 3/4" (1,9 cm) Transom Window Left Door Right Door Apply high quality exterior-grade caulk on the backside of door, behind frame near edge before installing to seal window. From back side of door, position window in opening and ensure square with door edge.
  • Page 37 DOOR STIFFENERS PARTS REQUIRED: 2" (5,1 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) BEGIN Center OO vertically on the left door in the door opening overlapping 3/4" (1,6 cm) with the edge of door. Secure using (7) 2" screws through outside trim into OO (Fig. A) Center OO vertically on the right door in the door opening offset 3/4"...
  • Page 38: Door Hardware

    DOOR HARDWARE PARTS REQUIRED: 1/2" (13 mm) Drill Bit 3/4" (1,9 cm) 1/4" (6 mm) Drill Bit BEGIN Measure and mark location of hole on outside of right door as shown (Fig. A) . Pre-drill hole with 1/4" drill. Re-drill hole with 1/2" drill. Keep drilled hole square to trim to avoid breaking edge of 1-1/2"...
  • Page 39 DOOR HARDWARE PARTS REQUIRED: 3-Point Door Locking Mechanism Handle (locking) with Screws 1-1/4” x8 1-1/4" x2 Secure backplate with 1" screws and handle with 1-1/4" screws as shown. Backplate Screw 1-1/4" Wood Screw 1-1/4" Pan Head Screw...
  • Page 40 DOOR HARDWARE See following pages for mounting locations of brackets and plates. Plate Washer 1-1/4" Pan Head Screw 1-1/4" UPPER BRACKET Pan Head (with offset) Screw Orient bracket as shown. Washer 1-1/4" Pan Head Screw Washer LOWER BRACKET (with offset) Orient bracket as shown.
  • Page 41 DOOR HARDWARE TOP of Door 2-1/4" Weatherstrip RIGHT DOOR LEFT DOOR Make sure rods are straight up and down when locating brackets. IMPORTANT! This rod to edge of weatherstrip 2-1/4" BOTTOM of Door...
  • Page 42 DOOR HARDWARE Drill with 3/8" bit PLATE to 2" depth. FRAMING Align Plates with vertical rod points. Drill-thru with 3/8" drill bit to 2" depth into header and floor. VERTICAL RODS FLOOR PLATE...
  • Page 43 RAFTERS PARTS REQUIRED: 3" (7,6 cm) Preassembled Rafter Preassembled Rafter with 2 Gussets with 1 Gusset ¸ BEGIN Secure rafters to top plate with two 3" screws above notch, as shown in (Fig. A, B). Note the One Gusset Rafters at each end. 24-3/8"...
  • Page 44 FRONT GABLE PANEL PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 4 x 4" (5,1 x 10,2 x 10,2 cm) 2 x 4 x 6-1/2" (5,1 x 10,2 x 18,4 cm) BEGIN Orient parts on flat as shown. Place LEFT front gable panel as shown and secure using 1-1/2" nails as shown. UY (on flat) Flush 1-3/4"...
  • Page 45 REAR GABLE PANEL PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 4 x 21" (5,1 x 10,2 x 53,3 cm) BEGIN Orient parts on flat as shown. Place LEFT front gable panel as shown and secure using 1-1/2" nails as shown. SBA (on flat) 1-3/4"...
  • Page 46 FRONT GABLE ASSEMBLY PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) Front Gable Rear Gable BEGIN Attach gable unit on front wall top plate. Measure 1-1/2" down from top plate and mark at each side as shown. Set gable unit on top plate. Hold secure with one 2"...
  • Page 47 FRONT GABLE LADDERS PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 61-7/8" (5,1 x 10,2 x 157,2 cm) 2 x 4 x 4-7/8" (5,1 x 10,2 x 12,4 cm) BEGIN You will build two assemblies (Fig. B). Arrange, measure and mark locations of four CLA as shown place CMA on top.
  • Page 48 FRONT GABLE LADDERS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 9 x 13-7/8" 7/16 x 9 x 48" (1,3 x 22,9 x 33,3 cm) (1,3 x 22,9 x 243,8 cm) Left Ladder Frame Right Ladder Frame Place each ladder assembly with longer end up, and secure roof panels as shown using 2"...
  • Page 49 LADDER ROOF PANELS PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) LEFT Front Ladder Assembly RIGHT Front Ladder Assembly BEGIN Position the Left front ladder assembly to the front gable flush at the center of the gable panels and secure with one 2" (5,1 cm) nail into the rafter at each end of the overhang (Fig A). Fig.
  • Page 50 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 48 x 96" 7/16 x 13-7/8 x 96" (1,1 x 121,9 x 243,8 cm) (1,1 x 35,2 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: all roof panels need to be installed with the rough side up (painted grid lines). BEGIN Attach a 48"x 96"...
  • Page 51 ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) Secure roof panels using 2" nails 6" apart on edges and 12" apart inside panel. 6" (15,2 cm) 12" (30,5 cm) Repeat STEPS 1 - 4 to attach roof panels on the opposite side. FINISH You have finished installing your roof panels.
  • Page 52 GABLE END SOFFITS PARTS REQUIRED: 2" (5,1 cm) 3/8 x 7-7/8 x 59-15/16" (1 x 20 x 152,2 cm) Ensure soffit boards are flush at seam (Fig. B) and flush at peak (Fig. D). BEGIN Position 59-15/16" overhang board Primed Side Down flush to front wall (Fig A) and gable panel seam (Fig B).
  • Page 53 EAVE SIDE SOFFITS PARTS REQUIRED: 2" (5,1 cm) 5-7/8 24-3/4" (1 14,9 62,9 3/8 x 5-7/8 x 72-3/4" (1 x 14,9 x 184,8 cm) Ensure soffit boards are flush at rafter ends (Fig. B) and flush at seams. BEGIN Position 72-3/4" and 24-3/4" soffit boards primed side down flush to gable soffits and rafter ends.
  • Page 54 EAVE SIDE FASCIA PARTS REQUIRED: 2" (5,1 cm) 3/8 x 4-3/4 x 80-5/8" (1 x 12,1 x 204,8 cm) 3/8 x 4-3/4 x 24-3/4" (1 x 12,1 x 75,6 cm) BEGIN Position 4-3/4 x 80-5/8" and 4-3/4 x 24-3/4" fascia boards with primed side out, flush with roof panels and front gable fascia as shown).
  • Page 55 GABLE FASCIA PARTS REQUIRED: SHIM 2" (5,1 cm) 3/8 x 3-1/4 x 5-7/8" (1 x 8,3 x 14,9 cm) Painted Red 3/8 x 4-3/4 x 62-3/8" (1 x 12,1 x 158,4 cm) Painted Green 3/8 x 4-3/4 x 62-3/8" (1 x 12,1 x 158,4 cm) BEGIN On rear gable end, position two 3-1/4 x 5-7/8"...
  • Page 56 CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8 x 1-3/4 x 74-1/2" (1 x 4,4 x 189,2 cm) 3/8 x 1-3/4 x 73-7/8" (1 x 4,4 x 187,6 cm) ¸ BEGIN Attach one 73-7/8" trim board flush under soffit panel and against eave wall (Fig. A) using one 2"...
  • Page 57 SHELVING PARTS REQUIRED: 2" (5,1 cm) 2 x 3 x10-1/8" (5,1 x 7,6 x 25,7 cm) 3/8 x 8 x 12-1/2" (1 x 20,3 x 31,8 cm) BEGIN Secure AE to bracket panels using three 2" (5,1 cm) nails. Assemble 5 shelf supports as shown;...
  • Page 58 SHELVING PARTS REQUIRED: 2" (5,1 cm) 1-1/4" (3,2 cm) 7/16 x 11-7/8 x 96" (1,1 x 30,2 x 243,8 cm) 1 x 4 x 96" (2,5 x 10,2 x 243,8 cm) Install shelf panels centered over shelf supports. Secure with two 1-1/4" (3,2 cm) screws at each support. Flush 11-7/8 x 96"...
  • Page 59 LOFT PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) 7/16 x 23-7/8 x 44-1/4" (1,1 x 112,4 x 104 cm) BEGIN Locate TP loft joists flush to bottom of top plate and secure with 3" (7,6 cm) nails at wall studs, as shown. BACK WALL Flush...
  • Page 60 COLLAR TIE PARTS REQUIRED: 2" (5,1 cm) 1 x 3 x 60" (2,5 x 7,6 x 152,4 cm) BEGIN Position and level collar tie on third rafter from front. HINT: For best appearance install collar tie on rafter facing away from door opening. Attach with 2"...
  • Page 61 GABLE VENT PARTS REQUIRED: #15021 #8 x 1" (2,5 cm) Pan Head Screws ¸ BEGIN Locate vent in the front gable wall as shown. Secure using 1" (2,5 cm) screws. #8 x 1" (2,5 cm) Pan Head Screws FINISH You have finished installing your vent.
  • Page 62 WALL VENT PARTS REQUIRED: 1/2" (1,3 cm) 8 x 16" (20,3 x 35,6 cm) ¸ BEGIN Choose a wall for vent location (A lower location is best if you have a gable vent). Measure and mark vent hole in wall as shown. Cut out marked opening. Caulk behind vent flanges.
  • Page 63 PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: •...
  • Page 64 SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/2" 1" Sealing Strip 1" (1,3 cm) (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
  • Page 65 SHINGLES continued... Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck FRONT OF BACK OF SHED SHED 1" (2,5 cm) Flush with starter row. Notch - or - Drip Edge Flush with starter row.
  • Page 66 SHINGLES continued... Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. 5"...
  • Page 67 SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles into THREE pieces. Hint: Use cut-off pieces first. 2" 2" (5 cm) (5 cm 2" 2" 2"...
  • Page 68 SHINGLES - RIDGE CAP continued... Continue installing ridge cap to back of roof. Make sure there is 4" between the shingle-color and edge of shingles. 4" (10 cm) Trim cap off flush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot.
  • Page 69 WARRANTY REGISTRATION Please complete your warranty registration to properly validate your warranty. Register your product online at: www.OnlineWarranty.net LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: Every product is warranted from defects in workmanship and manufacturing for 1 year. All accessories, hardware and metal components are warranted for 2 years.