Boiler Dimensions, Services & Clearances - IDEAL LOGIC+ SYSTEM2 S15 Installation & Servicing

Table of Contents

Advertisement

1.14 BOILER DIMENSIONS, SERVICES & CLEARANCES
The boiler connections are made on the boiler connection
tails.
The following minimum clearances must be maintained
for operation and servicing.
Additional space will be required for installation, depending
upon site conditions.
2.5
200
Water and Gas Connections
CH
Gas
Flow
Inlet
Data
PRV
Cond.
Grommet
Plate
Drain
Front Clearance
The minimum front clearance when built in to a cupboard is
5 mm from the cupboard door but 450 mm overall clearance
is still required, with the cupboard door open, to allow for
servicing.
*
Bottom Clearance
Bottom clearance after installation can be reduced to 15 mm.
This must be obtained with an easily removable panel to
provide the 100 mm clearance required for servicing.
For easy access to the pressure gauge a bottom clearance
of 15 mm is required for a partial open door.
Installation and Servicing
Section 1 - General
2.5
395
from case
100*
CH
Return
CH Circuit
Drain
Side and Rear Flue
a. Provided that the flue hole is cut accurately, e.g. with a core
drill, the flue can be installed from inside the building where
wall thicknesses do not exceed 600 mm.
700
Underside View
PRV
Grommet
CH
Cond.
Gas
Flow
Drain
PRV Grommet
Refer to Section
2.17
IMPORTANT:
Please ensure there is sufficient
clearance either side and below the boiler, particularly from
door hinges and the base of a cupboard, to allow the door to
be opened to allow the pressure gauge to be checked.
Refer to Section
2.17
All measurements in mm
278
Flue
terminal
98
152
CH
CH Circuit
Return
Drain
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logic+ system2 s18Logic+ system2 s24Logic+ system2 s30

Table of Contents