Unpacking - IDEAL LOGIC+ SYSTEM2 S15 Installation & Servicing

Table of Contents

Advertisement

2.2

UNPACKING

The boiler is supplied fully assembled in Pack A.
A telescopic or non-telescopic flue assembly for
rear or side flue outlet in Pack B is suppled as a
separate order.
Pack A Contents
1.
Boiler
2.
Hardware Pack Box
3.
Wall Mounting Plate
4.
These Installation/Users Instructions
5.
Wall Mounting Template
6.
Boiler Warranty
7.
PRV Drain Pipe
Hardware Pack
Box Contents
9.
1x
HP Box - 180 x 111 x 57.5 mm
10. 2x
Pipe CH Flow/Return
11. 1x
Gas Cock
12. 2x
Valve CH G
/
x 22 mm
3
4
13. 1x
Pipe Gas Inlet
Accessory Bag Contents
14. 3x
Washers*
15. 2x
Wall Plugs
16. 2x
Screws
17. 1x
Flue Clamp Screw
18. 1x
PRV Clip
*Refer to Valve Washer Template inside box lid.
Installation and Servicing
Section 2 - Installation
Unpack and check the contents
1
10
18
to ensure correct operation of the boiler.
Refer to Section
2
5
3
6
4
7
11
13
10
12
IMPORTANT
This clip needs to be fitted
2.17
15
16
17
9
14
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logic+ system2 s18Logic+ system2 s24Logic+ system2 s30

Table of Contents