Boiler Clearances; Hydraulic Resistance - IDEAL Concord CXi 110 Installation & Servicing Manual

Table of Contents

Advertisement

Graph 1 - Heat Load / Water Volume
2
CLEARANCES & DIMENSIONS
Table 4
Boiler Size
Front clearance
Rear clearance
Side clearance
Dimension A
Dimension B
Dimension C
Dimension D
Dimension E
Dimension F
6
GENERAL
Graph 2 - Hydraulic Resistance
CXi 110
mm (in)
mm (in)
mm (in)
100 (4) - not including clearance for side fitted flow header
mm (in) 1036 (40
)
1036 (40
3/4
mm (in)
175 (7)
mm (in) 1107 (43
)
1107 (43
3/4
mm (in)
816 (32
)
816 (32
1/8
mm (in)
553 (21
)
553 (21
3/4
mm (in)
220 (8
)
5/8
CXi 120
CXi 140
750 (29
1/2
200 (8)
)
1036 (40
3/4
3/4
175 (7)
175 (7)
)
1230 (48
3/4
1/2
)
939 (37)
1/8
)
615 (24
3/4
1/4
220 (8
)
220 (8
5/8
5/8
POSITION OF BOILER
Minimum clearances required from walls or
other fixed objects to allow for the free access
of combustion air are shown in Table 4 above.
Any combustible material adjacent to the
boiler and its flue system must be so placed or
shielded as to ensure that its temperature
does not exceed 65
CXi 160
CXi 180
)
)
1086 (42
)
1140 (45)
3/4
197 (7
)
250 (10)
3/4
)
1353 (53
)
1476 (58
1/4
1062 (42
)
1185 (46
3/4
)
676 (26
)
738 (29)
5/8
)
220 (8
)
320 (12
5/8
0
C (150
0
F).
Concord CXi -
)
1/8
)
5/8
)
1/2
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents