System Requirements - Central Heating - IDEAL LOGIC+ SYSTEM2 S15 Installation & Servicing

Table of Contents

Advertisement

1.15 SYSTEM REQUIREMENTS - CENTRAL HEATING

a. The method of filling, refilling, topping up or flushing sealed
primary hot water circuits from the mains via a temporary
hose connection is only allowed if acceptable to the local
water authority.
b. Antifreeze fluid, corrosion and scale inhibitor fluids suitable
for use with boilers having aluminium heat exchangers may
be used in the central heating system.
General
1. The installation must comply with all relevant national and
local regulations.
2. Design the system for flow temperatures up to 80
3. The system components must be suitable for an operating
pressure of 3 bar and a maximum temperature of 110°C.
The following components are incorporated within the
appliance:
a.
Circulating pump.
b.
PRV, with a non-adjustable preset lift pressure of
3 bar.
c.
Pressure gauge, covering a range of 0 to 4 bar.
d.
An 8 litre expansion vessel, with an initial charge
pressure of 0.75 bar.
4. Makeup Water. One of the following provisions must be
made for replacing system water loss:
a.
Manually filled vessel
The vessel must:
Have a visible water level
Be mounted at least 150 mm above the system's
highest point
Connect through a non-return valve to the system
Be at least 150 mm below the makeup vessel on the
return side of the radiators
b.
System prepressurisation.
The efficiency of the expansion vessel will be
reduced in a pressurised system; a larger vessel or
smaller system volume may be necessary.
If the vessel's capacity is not sufficient, an additional
vessel must be installed on the return to the boiler.
If the system is not pressurised, the cold water
capacity must not exceed 143 litres.
Guidance on vessel sizing is given in table above.
Hose unions
CH Return
Temporary hose
(disconnect after filling)
Ecl 6053
12
Section 1 - General
Table 3 Vessel Sizing
PRV setting
Vessel charge pressure
System pre-charge pressure bar
System volume
o
C.
For other system volumes
multiply by the factor across
Table 4
Model
Max CH uutput
Water flow rate
Temp differential
Head available
for system
With Ideal System
Filter & Valves
5. Filling
The system may be filled by the following method:
Where the mains pressure is excessive a pressure
reducing valve must be used to facilitate filling.
a.
Thoroughly flush out the whole system with cold
water.
b.
Fill and vent the system until the pressure gauge
registers 1 bar and examine for leaks
Mains
water supply
c.
Check that a 15 mm diameter pipe is correctly
located and secured (using the clip supplied)
d. Check the operation of the PRV by raising the water
pressure until the valve lifts. This should occur within
0.3 bar of the preset lift pressure.
e.
Check no escape of water occurs except at the
Additional
discharge point
stop valve
f.
Release water from the system until the
minimum system design pressure is reached;
Double check valve
1.0 bar if the system is to be pre-pressurised.
assembly
note direction of flow
(
)
bar
bar
None
Expansion vessel
(litres)
volume (litres)
25
1.6
50
3.1
75
4.7
100
6.3
125
7.8
150
9.4
175
10.9
190
11.9
200
12.5
250
15.6
300
18.8
0.063
15
18
kW
15
18
l/min
10.7
13
(gal/min)
(2.4)
(2.8)
C
20
20
o
m.w.g.
5
4.5
(ft.w.g.) (16.2)
(14.7)
m.w.g.
4.9
4.3
(ft.w.g.)
16
14.1
3.0
0.5 to 0.75
1.0
1.8
3.7
5.5
7.4
9.2
11.0
12.9
14.0
14.7
18.4
22.1
0.074
24
30
24.2
30.3
17.2
21.5
(3.8)
(4.7)
20
20
3.3
1.9
(10.8)
(6.2)
3.0
1.5
9.8
4.9
Installation and Servicing

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logic+ system2 s18Logic+ system2 s24Logic+ system2 s30

Table of Contents