Boiler Dimensions, Services & Clearances - IDEAL LOGIC COMBI ESP1 24 Installation And Servicing

Hide thumbs Also See for LOGIC COMBI ESP1 24:
Table of Contents

Advertisement

1.16 BOILER DIMENSIONS, SERVICES & CLEARANCES
The boiler connections are made on the boiler connection tails.
Refer to Section 2.16.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending upon
site conditions.
Side and Rear Flue
a. Provided that the flue hole is cut accurately, e.g. with a core
2.5
Centre line
of boiler
43.5
65
28.5 28.5 60.6
14
SECTION 1 - GENERAL
395
2.5
from case
Side flue
dim. A
75
56.4
37.5
drill, the flue can be installed from inside the building where
wall thicknesses do not exceed 600mm. Where the space into
which the boiler is going to be installed is less than the length
of flue required the flue must be fitted from the outside.
Installation from inside ONLY
b. If a core boring tool is to be used inside the building the
space in which the boiler is to be installed must be at least
wide enough to accommodate the tool.
700
Underside View - Dimensions to Wall
Filling Loop
CH
DHW
Gas
DHW
CH
Flow
Outlet
Inlet
Return
W A L L
Front clearance
The minimum front
clearance when built in to
a cupboard is 5mm from
the cupboard door but
450mm overall clearance
is still required, with the
cupboard door open, to
CH Circuit
Drain
allow for servicing.
*
Bottom clearance
Bottom clearance after
installation can be
reduced to 5mm. This
must be obtained with
an easily removable
panel to provide the
100mm clearance
required for servicing.
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logic combi esp1 30Logic combi esp1 35

Table of Contents