Delivery And Handling; Transport; Assembly - Nibe VVM 500 Installer Manual

Indoor module
Hide thumbs Also See for VVM 500:
Table of Contents

Advertisement

Delivery and handling

Transport

VVM 500 should be transported and stored vertically in a
dry place.
However, the VVM 500 can be carefully laid on its back when
being moved into a building.

Assembly

Place VVM 500 on a solid foundation indoors that can take
its weight.
Use the product's adjustable feet to attain a horizontal
and stable set-up.
20-55 mm
30 - 50 mm
The space where VVM 500 is located must be frost-free.
Because water can exit the safety valve
when connected to VVM 500, the space where VVM 500
is placed must be provided with a floor drain.
1 Not enclosed.
NIBE VVM 500
0
R
1
for hot water,
INSTALLATION AREA
Leave a free space of 800 mm in front of the product. All
service on VVM 500 can be carried out from the front.
50
NOTE
Leave 10 – 25 mm free space between VVM 500
and the wall behind for routing cables and pipes.
Chapter 2 | Delivery and handling
10-25
50
800
7

Advertisement

Table of Contents
loading

Table of Contents