7 Commissioning

7
Commissioning
NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
NOTICE
Make sure that both the domestic hot water tank and the
space heating circuit are filled before turning on the power
of the unit.
If not filled before turning on power, and in case
Emergency is active, the backup heater thermal fuse may
blow. To avoid breakdown of the backup heater, fill the unit
before turning on power.
INFORMATION
Protective functions – "Installer-on-site mode". The
software is equipped with protective functions, such as
room antifrost. The unit automatically runs these functions
when necessary.
During installation or service this behaviour is undesired.
Therefore, the protective functions can be disabled:
▪ At first power-on: The protective functions are
disabled by default. After 36 h they will be automatically
enabled.
▪ Afterwards: An installer can manually disable the
protective
functions
protections=Yes. After his work is done, he can
enable the protective functions by setting [9.G]:
Disable protections=No.
7.1

Checklist before commissioning

After the installation of the unit, first check the items listed below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.
You read the complete installation instructions, as
described in the installer reference guide.
The indoor unit is properly mounted.
The following field wiring has been carried out according
to this document and the applicable legislation:
▪ Between the local supply panel and the indoor unit
▪ Between the indoor unit and the valves (if applicable)
▪ Between the indoor unit and the room thermostat (if
applicable)
The system is properly earthed and the earth terminals
are tightened.
The fuses or locally installed protection devices are
installed according to this document, and have NOT been
bypassed.
The power supply voltage matches the voltage on the
identification label of the unit.
Installation manual
34
by
setting
[9.G]:
Disable
There are NO loose connections or damaged electrical
components in the switch box.
There are NO damaged components or squeezed
pipes on the inside of the indoor unit.
Backup heater circuit breaker F1B (field supply) is
turned ON.
The correct pipe size is installed and the pipes are
properly insulated.
There is NO water and/or brine leak inside the indoor
unit.
There are no odour traces noticeable of the used brine.
The air purge valve is open (at least 2 turns).
The pressure relief valve purges water when opened.
Clean water must come out.
The shut-off valves are properly installed and fully open.
The domestic hot water tank is filled completely.
The brine circuit and water circuit are filled correctly.
NOTICE
When the brine circuit is not ready to be used, the system
can be set to HP
forced
[9.5.2]=1 (HP forced off = enabled).
Space heating and domestic hot water are then provided
by the backup heater. Cooling is NOT possible when this
mode is active. All commissioning related to or making use
of the brine circuit should NOT be performed until the brine
circuit is filled and HP forced off is deactivated.
7.2

Checklist during commissioning

To perform an air purge on the water circuit.

To perform an air purge on the brine circuit via brine
pump test run or 10-day brine operation function.
To perform a test run.
To perform an actuator test run.
Underfloor screed dryout function
The underfloor screed dryout function is started (if
necessary).
To start 10-day brine pump operation.
7.2.1
To perform an air purge on the water
circuit
Conditions: Make sure all operation is disabled. Go to [C]:
Operation and turn off Room, Space heating/cooling and Tank
operation.
off mode. To do this, set
EGSAH/X06+10DA9W(G)
Daikin Altherma 3 GEO
4P569811-1C – 2020.07

Advertisement

Table of Contents
loading

Table of Contents