Huawei UPS5000-A-30 kVA Quick Manual page 47

Hide thumbs Also See for UPS5000-A-30 kVA:
Table of Contents

Advertisement

UPS5000-A-(30 kVA–120 kVA)
Quick Guide
Figure 1-47 Determining floating nut installation positions
(1) Floating nut installation positions
Figure 1-48 Installing a floating nut
Step 4 Flip the ready switches on the power units to
power units.
Two persons are required to move a power unit. Keep the power unit horizontal
during movement.
Issue 14 (2022-09-06)
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Scale plate
(not ready), and remove the
1 Installation
40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents