UPS5000-A-(30 kVA–120 kVA)
Quick Guide
Figure 1-47 Determining floating nut installation positions
(1) Floating nut installation positions
Figure 1-48 Installing a floating nut
Step 4 Flip the ready switches on the power units to
power units.
Two persons are required to move a power unit. Keep the power unit horizontal
during movement.