Integrating The Ps-17 Into Your Network; Ps-17 Hardware - EFI Kyocera 17 Configuration And Setup

Table of Contents

Advertisement

Integrating the PS-17 into your network

Your service technician ensures that the PS-17 is correctly installed at your site, the power supply and cooling are
adequate, and the required cables are connected.
Note: Never turn off the PS-17 power switch while the PS-17 is running.

PS-17 hardware

This section provides illustrations for the PS-17.
Figure 1: PS-17 front panel
1 Service switches (for service use only)
2 LEDs (2-digit soft progress display)
Configuration and Setup
Integrating the PS-17 into your network
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents