Installation And Operation; Installing The Valve - GEM 507 Installation, Operating And Maintenance Instructions For The Installer And The User

Angle seat globe valve
Table of Contents

Advertisement

Available languages

Available languages

11

Installation and operation

Prior to installation:
Ensure that valve body material and seat
G
seal are appropriate and compatible to
handle the working medium.
Check the suitability prior to the
G
installation.
See chapter 6 "Technical data".
11.1

Installing the valve

WARNING
The equipment is subject to pressure!
® Risk of severe injury or death!
Only work on depressurized plant.
G
WARNING
Corrosive chemicals!
® Risk of caustic burns!
Wear appropriate protective
G
gear when installing.
CAUTION
Hot plant components!
® Risk of burns!
Only work on plant that has
G
cooled down.
CAUTION
Never use the valve as a step or an aid
for climbing!
® This entails the risk of slipping-off or
damaging the valve.
CAUTION
Do not exceed the maximum
permissible pressure!
® Take precautionary measures to
avoid possible pressure surges
(water hammer).
Installation work must only be performed
G
by trained personnel.
Use appropriate protective gear as
G
specifi ed in plant operator's guidelines.
507
Installation location:
Do not apply external force to the valve.
G
Choose the installation location so that
G
the valve cannot be used as a foothold
(climbing aid).
Lay the pipeline so that the valve body
G
is protected against transverse and
bending forces, and also vibrations and
tension.
Only mount the valve between
G
matching aligned pipes.
Direction of the working medium:

Please note the fl ow direction!
2/2-way body
The fl ow direction is indicated by an
arrow on the valve body.
Installation:
1. Ensure the suitability of the valve for
each respective use. The valve must
be appropriate for the piping system
operating conditions (medium, medium
concentration, temperature and pressure)
and the prevailing ambient conditions.
Check the technical data of the valve and
the materials.
2. Shut off plant or plant component.
3. Secure against recommissioning.
4. Depressurize the plant or plant
component.
5. Completely drain the plant (or plant
component) and let it cool down until
the temperature is below the media
vaporization temperature and scalding
can be ruled out.
6. Correctly decontaminate, rinse and
ventilate the plant or plant component.
24 / 32
CAUTION
Angle body

Advertisement

Chapters

Table of Contents
loading

Table of Contents