Toshiba GR200 Series Instruction Manual page 805

Centralized busbar protection ied
Hide thumbs Also See for GR200 Series:
Table of Contents

Advertisement

14.
PIXIT FOR CONTROL MODEL(Continued)
ID
Ed
Does the IED accept a Select/SelectWithValue
from the same client when the control object is
already selected (Tissue #334)
Ct17
1
Is for SBOes the internal validation performed
during the SelectWithValue and/or Operate
Ct18
1,2
step
Can a control operation be blocked by Mod=Off
Ct19
-
or [On-]Blocked (Compare PIXIT-Sr5)
Does the IED support local / remote operation
Ct20
1,2
Does the IED send an InformationReport with
LastApplError as part of the Operate response-
Ct21
1,2
for control with normal security
How to force a "parameter-change-in-
execution"
Ct22
2
How many SBOns/SBOes control objects can be
Ct23
1,2
selected at the same time?
Can a controllable object be forced to keep its
old state e.g. Internal Controllable Objects may
not be accessible to force this, whereas a switch
Ct24
1,2
like Circuit Breaker outside the DUT can?
When CDC=DPC is supported, is it possible to
have DPC (Controllable Double Point) go to the
Ct25
1,2
intermediate state? (00)
Name a DOes point (if any) with a finite
operate timeout and specify the timeout
(in milliseconds)
Ct26
1,2
Does the IED support control objects with
external signals?
Ct27
2
Description
- 791 -
Value / Clarification
SBOns:
N
SBOes:
N
Yes for both SelectWithValue and
Operate
Deprecated
Y
SBOns:
N
DOns:
N
N.A.
SBOns:
n = 1
SBOes:
n = 1
Y
Need PLC Logic customization.
Y
The timeout time is setting.
One example,
DPSY01-RST
Default value is 300[ms]
(10[ms]-1000[ms])
DOns:
N
SBOns:
N
DOes:
N
SBOes:
N
Centralized GRB200
(Soft: 030, 031, 032, 033, 034)
6F2S1931 (0.20)
(PIXIT Ed.1&Ed.2)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Grb200

Table of Contents