Toshiba GR200 Series Instruction Manual page 214

Centralized busbar protection ied
Hide thumbs Also See for GR200 Series:
Table of Contents

Advertisement

the signal "DCB SND OR", corresponding to the GOOSE publish, this must be performed at
the respective screens in GR-TIEMS†. That is, the user should select the "stVal" item for each
IED. After setting, the user should write the setting date for each respective IED.
Selected IED
1
Required settings in
2
the respective IEDs.
Figure 3.4-3 Example of DCB setting for IED-1 using GR-TIEMS
†Note: For more operation information on GR-TIEMS, see Chapter
Provision of selected status
3.4.2
Let us assume that a select-command is sent for an IED to control a target-device by the
substation automation system (SAS†), but the target-device is not ready to be controlled. The
unready condition might be due to the target-device already being in operation (e.g., CB
tripping) or a failure of the device may have occurred; thus, the IED has to drop the select-
command. If this occurs, the IED is required to send a message stating the reason to the SAS†.
Table 3.4-1 lists the messages generated in the CMNCTRL1 function describing the failure.
Table 3.4-1 Reason messages due to the release of the select-command
Signal Number
5A0001 3008001FB4
5A0001 2008001008
5A0001 2208001001
5A0001 6A08001009
5A0001 3008001FB4
†Note: The user should recognize that the reason messages are only available for
operation with the GCS1000 control system manufactured by Toshiba.
Miscellaneous settings
3.4.3
The CMNCTRL1 function has the following five common settings:
1. Control direction:
Signal Name
Description
SCS_CTLNUM
SCS_ORCAT
SCS_ADDCAUSE
Reason codes for the SAS†
SCS_ORIDENT
SCS_CTLNUM
The [SDCEN] can configure the control directions of the SPOS,
- 200 -
6F2S1931 (0.20)
Engineering tool
.
Centralized GRB200
(Soft: 030, 031, 032, 033, 034)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Grb200

Table of Contents