HP HPE Synergy 12000 Frame Setup And Installation Manual page 22

Hide thumbs Also See for HPE Synergy 12000 Frame:
Table of Contents

Advertisement

Item
Item
Name
Name
14
Lift handles (optional)
15
Removable device bay shelves
16
Reusable zip ties for power supplies (single-
phase frames only)
17
CAT6A cable or DAC cable or SFP+ DAC
cable ,
1 3
18
HPE Synergy Start Here Poster
19
Installation instructions for compute
modules, options, and interconnects
20
HPE Synergy 12000 Frame Rack Template
1
Quantity as ordered
2
Quantity and type as ordered
3
Not shown
Description
Description
3
The lift handles can be used to lift a frame into or out of a rack.
The removable device bay shelves can be used to partition the device
3
bays for full or half-height components.
Reusable zip ties that help prevent single-phase power cables from
disconnecting from the power connectors.
3
CAT6A or DAC cable or SFP+ cable for cabling frames, depending on the
frame link module ordered.
The quick setup poster provides an overview of the installation process.
3
The printed installation instructions for HPE Synergy components.
3
The printed template for locating the positions of frames, rack rails, and
3
cage nuts in a rack.
2.00 ft (60.96 cm) cable—Used for cabling two consecutive frames.
10.00 ft (304.80 cm) cable—Used for cabling the top frame to the
bottom frame in a rack.
21.00 ft (640.08 cm) cable—Used for cabling management links
requiring long runs to the top of the rack.
Pallet contents
22

Advertisement

Table of Contents
loading

Table of Contents