Recommendations For Cable Management - HP StorageWorks SAN Switch 2/32 Installation Manual

Version 4.0.x
Hide thumbs Also See for StorageWorks SAN Switch 2/32:
Table of Contents

Advertisement

5. Power off the new switch and connect one Fibre Channel cable from the SAN to
the new switch.

Recommendations for Cable Management

HP recommends following these cable management guidelines:
Plan cable management before installing the switch in a rack
Leave at least one meter of slack for each port cable (this provides room to remove
and replace the switch)
If using ISL Trunking:
— Group cables by trunking groups.
— The cables used in trunking groups must meet specific requirements. For a list
of these requirements, refer to the hp StorageWorks ISL Trunking Version
3.0.x/4.0.x User Guide.
Label the fiber optic cables and record the devices to which they are connected
Keep LEDs visible by routing port cables and other cables directly downwards or
otherwise away from the LEDs
Do not use tie wraps on fiber optic cables, because they are easily overtightened
and can damage the optic fibers
NOTE: The minimum bend radius for a 50 micron cable is 2 inches under full tensile load, and
1.2 inches with no tensile load.
SAN switch 2/32 version 4.0.x installation guide
Installing the SAN Switch 2/32
2–31
2–31

Advertisement

Table of Contents
loading

Table of Contents