QUICK START GUIDE
Step 3 – Connect AC input
The AC input is provided through a IEC - C19 connector or 3 pin
terminal connector based on the configuration of the shelf
discussed as below:
For J2007003L301AB and J2007003L301A Configurations:
Connect the IEC - C19 AC input cable to the C19 connector
provided at the rear side of shelf.
For J2007003L301CB and J2007003L301C Configurations:
Use the thumb screw to remove the AC cover provided at
the rear side of shelf.
Route the cable through the hole in the AC cover.
Wire size recommended is 12 AWG with ferrule.
Strip wire 3/16"
Insert wire fully into wire entry of the female 3 pin terminal
connector.
Tighten the screw (1/16" flat screw driver).
Connect the 3-pin female connector to the AC input terminal
of the shelf.
Mount the AC cover back over the input and tighten the
thumb screw.
Danger: Turn OFF and lock-out tag-out the AC source before
making AC connections. Follow all local and national wiring rules.
Caution: Route AC cables to avoid contact with sharp or rough
surfaces that may damage insulation and cause a short circuit.
Step 4 – Connect Battery (Only applicable for J2007003L301CB and
J2007003L301CB)
Wire size: 6AWG
Lug landing: Single hole 90° lugs, 6AWG size
Screw size: 10-32
1.
Attach single lugs to the wire .
2. Connect the lugs to the bus bar.
3. Torque the screw to 30 in-lb (3.4Nm).
Page 11
© 2021 ABB. All rights reserved.
AC Input (C19 Connector)
Figure 6: AC Input IEC– C19 Connector
AC Input (3-pin
terminal connector)
Phoenix Mating
L1 L2/N PE
L1
L2/N
PE
Figure 7: AC Input Terminal block Connector
Lugs
(GND)
48VDC
Figure 8: Connect Battery
connector
Version 1.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

J2007003l301cJ2007003l301abJ2007003l301a

Table of Contents