QUICK START GUIDE
Information - Tools Required
•
Wire cutters and strippers
•
Digital meter with an accuracy of ±0.02%
Torque wrench– 0-65 in-lb (0-10 Nm)
•
Step 1 – Mount Shelf
1.
Position the SPS shelf System mounting ears with the
mounting frame.
2.
Attach shelf to the frame using three screws on each
side (four on each side) - 12-24 (provided).
3.
Torque to 35 in-lb (4Nm) - 5/16" socket.
4. Provide 2 inch minimum clearance at back of shelf for
converter airflow.
Step 2 – Connect Chassis Ground
1.
Lug Landings: #10 double-hole on 5/8-inch center (lugs not provided)
2. Minimum 10 AWG wire is recommended.
3. Torque to 30 in-lb (3.4Nm) - 5/16" socket.
Some applications may rely on frame mounting screws for shelf ground omitting the chassis ground cable.
Page 10
© 2021 ABB. All rights reserved.
•
Sockets 5/16", 7/16".
•
Cable Crimpers
Screw drivers (flat-blade and Phillips #1 and #2)
•
Chassis Ground Connection
Figure 5: Chassis Ground Connection
Mounting Ears
Figure 4: Mounting Shelf
Version 1.0