Thermo Scientific F6000 Installation And Operation Manual page 52

Hide thumbs Also See for F6000:
Table of Contents

Advertisement

10
Installation and Operation of Air Control
Operation
A flow rate of 40 to 45 liters per minute will provide three air exchanges of the
chamber per minute.
Appropriate exhaust must be provided to remove smoke and gases produced in an
ashing procedure.
Failure to connect the exhaust port to an appropriate exhaust system will result in
smoke and gases filling the work area. Without the connection, gases and smoke will
escape around the door seal and at the rear of the furnace.

Advertisement

Table of Contents
loading

Table of Contents