Control Panel Maintenance - Barrus Shire 15 70WB Manual

Workboat engine
Table of Contents

Advertisement

• Loosen the top adjuster bolts and the lower mounting pivot nut and bolt.
• Push the alternator towards the engine to loosen the belt.
• Remove the belt.
• Hold the belt in position over the top alternator pulley. Rotate the engine if required by
hand, to guide the new belt into the "vee".
• Re-tension the belt as above.

13. Control Panel Maintenance

REMOVE THE IGNITION KEY BEFORE WORKING IN ENGINE COMPARTMENT.
• To replace an illumination bulb: Release the panel from its mounting. The bulbs
are accessible from the rear of the panel. Remove the wires, unscrew the nut and pull
out the bulb housing from the panel. Remove the bulb and replace. Refit bulb housing,
screw the nut back up and refit the wires.
• To replace any gauge: Release the panel from its mounting. The gauges are
accessible from the rear of the panel. Unplug the wire connectors, unscrew and pull
the gauge out of the panel. Replace the gauge and refit. Reattach the wiring
connectors.
Periodically squirt a lubricant into the key switch slot when the key has been
removed (see Section 8 – Service Schedule). A lubricant such as WD40 – with silicon,
would be suitable. Other lubricants are available. Then with the battery master switch
turned off, operate the key switch a couple of times. This will ensure the lubricant
works into the mechanism.
RDG603A81 – Issue 2
TURN BATTERY ISOLATION SWITCHES OFF.
WARNING:
Page 49 of 93

Advertisement

Table of Contents
loading

Table of Contents