Sun Microsystems SPARCcenter 2000 Installation Manual page 46

Hide thumbs Also See for SPARCcenter 2000:
Table of Contents

Advertisement

4
4-4
Figure 4-3
Local/Remote Switch
6. Turn the key switch to the On position.
The system will run POST diagnostics for about one minute and then boot.
You should see and hear several things happen:
The DC-powered blower fan in the top of the cabinet begins turning.
The left LED (green) on the front of the cabinet turns on immediately to
indicate the DC power supply is functioning.
The middle LED (yellow) lights immediately and should turn off after
approximately 60 seconds.
The right LED (green) lights after POST completes to denote boot is
successful.
The terminal beep indicates that the system is ready.
The terminal screen lights up upon completion of the internal self-test.
7. Watch the terminal screen for any POST error messages.
SPARCcenter™ 2000/2000E Installation Manual—June 1996

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparccenter 2000e

Table of Contents