Turn Up And Testing; Fault Isolation - ADC PG-PLUS PRL-779 Manual

Table of Contents

Advertisement

Turn up and Testing

T
T
URN UP AND
To continue the installation of your PRL-779 for readiness:
1
Ensure that at least one COLU is installed into the PG-Flex
Technical Practice for verifying the COLU installation.
2
Locate the HDSL Tip and Ring on the protector block or punchdown, apply a short between the HDSL Tip
and Ring conductors for at least 3 seconds. Start-up begins in 3 seconds after removal of the short. Within 2
minutes the system should provide dial tone and battery voltage on the subscriber pairs.
3
Listen for a dial tone using the customer phone line.
4
If dial tone is not heard, then refer to the appropriate COLU Technical Practice for COLU Fault Indicators.
F
I
AULT
SOLATION
The following sections detail the fault isolation procedures. For sections that indicate a condition such as distance
limitation exceeded, refer to
12
ESTING
"Specifications" on page 2
January 6, 2003
Plus
COT shelf. Refer to the appropriate COLU
for the correct values.
SCP-PRL779-015-04H
PRL-779 List 1E

Advertisement

Table of Contents
loading

Table of Contents