Required Tools And Test Equipment; Preparing The Rt; Mounting The Rt - ADC PG-PLUS PRL-779 Manual

Table of Contents

Advertisement

Required Tools and Test Equipment

R
T
EQUIRED
OOLS AND
LS/GS telephone set
1
/
-inch flat-head screwdriver
4
No. 1 Phillips screwdriver
Insulated-handle
Insulated-handle needlenose pliers
Insulated-handle wire cutter
P
REPARING THE
HDSL and subscriber wiring are threaded through the Insulation Displacement Contact (IDC) connector located
on the right-hand side of the RT. Use either the wall mounting or the line-up template provided in the Mounting
Kit for the RT wall positioning.
The RT is now prepared for mounting.
M
OUNTING THE
The PAU-710 are suitable for mounting on a wall or line-up. Wall mounting is preferable.
Before setting up the equipment, select a location that will allow sufficient access to wiring connections
from the telco access door.
4
T
E
EST
QUIPMENT
3
/
-inch nut driver
8
RT
RT
January 6, 2003
SCP-PRL779-015-04H
PRL-779 List 1E

Advertisement

Table of Contents
loading

Table of Contents