Check Equipment Motion - IEMAI HIGH-TEMPERATURE Series Operating Instructions Manual

Table of Contents

Advertisement

3.2 Check Equipment Motion

Step 1
Use 6mm² cable to connect
AC220V single-phase power socket
Step 4
1. The XYZ axis movement is
controlled manually by touch
screen
2.
Observe whether the figure
moves normally
Step 2
Plug in the power connector at the
rear of the machine to the main
power supply
Step 5
1. Control E1 and E2 extrusion
through the touch screen
2.
Check whether the gears of the
left and right sprinklers rotate
clockwise
- 18 -
Print More Materials, All For Application
Step 3
It is shown in Figure 3
Step 6
1. Preheat through touch screen
2. It can set the temperature of hot
bed, left nozzle and right nozzle
3. The temperature on the right
represents the set temperature,
and the temperature on the left
represents the actual temperature
4. Recommended hot bed
temperature for first preheating:
50 ° C ±2 ° C
5. Left and right nozzle
temperature: 210℃±2℃
Please be careful with high
temperature and operate with
caution

Advertisement

Table of Contents
loading

This manual is also suitable for:

Magic-ht-max

Table of Contents