ADC PG-PLUS PLL-720 Technical Practice page 58

Table of Contents

Advertisement

Test Submenu
b.1. To continue with the test, press
the test.
Performing a SDT on one of the POTS channel interrupts service on the line under test. The remaining
lines on the PG-Plus system remains in service.
When the tests are complete, the Drop Tests Results screen displays. The results contains Subscriber Test,
Failure Condition, and Test Status. Tests are performed in the order of display. If a test fails, the remaining
tests are not performed (as per TR-909). It takes approximately seven to eight seconds for all tests to
complete.
48
. A
message displays on the screen throughout
Test In Progress
Y
January 6, 2003
SCP-PLL720-020-03H
PLL-720, PLL-721 List 2's