CONTENTS
1
INTRODUCTION ........................................ 1
2
2.1
Unpacking ......................................... 3
2.2
2.3
2.3.1
Transmitters .......................... 5
2.3.2
Sensors ................................. 5
3
3.1
Grounding .......................................... 5
3.2
Cables ............................................... 6
3.2.1
(Remote Versions only) ........ 6
3.2.2
Cable (Alternative Type -
North American Wiring
Practice) ................................ 7
3.2.3
(IEC Installation Practice) .... 7
3.2.4
(North American - 0.5in) ...... 8
3.3
3.3.1
Sensors ................................. 8
3.3.2
(All versions) ....................... 10
3.3.3
MagMaster-CalMaster
Adapter ............................... 11
3.4
3.4.1
Frequency Outputs ............. 12
3.4.2
PLC Interface ...................... 12
3.4.3
Alarm Outputs ..................... 13
3.4.4
Contact Input ...................... 13
3.4.5
Current Output .................... 14
3.4.6
Computer Connection ........ 15
3.4.7
Connections ........................ 16
4
4.1
Startup ............................................. 17
PROTECTION ................................................ 19
APPENDIX B - MAGMASTER BLOCK
DIAGRAM ....................................................... 20
1 INTRODUCTION
TM
MagMaster
is a range of high performance
electromagnetic
flowmeters
measurement of electrically conductive fluids
and slurries, and is normally supplied as a
calibrated system, with the transmitter, factory
configured, to a supplied full-bore or insertion
probe sensor.
A wide range of options is available to suit most
applications, including:
Integral or remote transmitter.
Glass loaded polypropylene or aluminium
transmitter housing.
TM
Combined Hart
the aluminium housing transmitter.
Flanged or wafer style sensors.
Insertion Probes.
Approved Versions, including:
Hazardous area operation.
Hygienic.
TM
HART
communication protocol.
Warning.
For
MagMaster
Versions see the full installation manual.
Warning.
• Installation and maintenance must only
be carried out by suitably trained
personnel.
• All relevant sections of this manual must
be read before selecting a location.
• Safety requirements of this equipment,
any associated equipment and the local
environment
must
consideration.
• The
installation
equipment must be in accordance with
relevant national and local standards.
for
and Keypad support in
Approved
/Hazardous
be
taken
into
and
use
of
this
the
1