Powering - Xantrex TRUECHARGE 2 Installation Manual

Hide thumbs Also See for TRUECHARGE 2:
Table of Contents

Advertisement

Installation
Powering Up
Make one last check that all connections are correct and
connectors are secure.
The Truecharge™ 2 Battery Charger charger may now be
powered up.
1. Close the DC disconnect switch or breaker.
WARNING: Fire hazard
The final connection of the DC battery circuit will generate an arc.
Ensure all areas of the system, including batteries and engine
compartments, are well ventilated prior to making this connection.
2. Switch the AC power on at the source breaker. It is
Note:
alone when DC power is applied and the minimum battery
voltage (i.e., the connected batteries) is above 9 V.
2–24
This guide for use by qualified installers only
Elcodis.com
electronic components distributor
normal to see a 7 to10 second delay while the charger
powers up. During this time, the indicator LEDs on the
onboard display and the remote panel will illuminate for
a second (power on test) before reporting charging and
battery status information.
The indicator LEDs will also illuminate with DC power
975-0402-01-01

Advertisement

Table of Contents
loading

Table of Contents