Load Screen; Dashboard Screen - Zamboni FastICE DK - 11000 Operating Manual

Table of Contents

Advertisement

Operating Manual

Load Screen

The Load Screen is displayed while the display program is loading. It will remain displayed until the display
program has fully loaded, which takes 25 to 30 seconds). When the display program has fully loaded, the
display will change to the Dashboard Screen.

Dashboard Screen

The Dashboard Screen provides a read-out of real time operational performance.
This is a mostly passive display – interaction is allowed only for Scaling (Water Flow Adjustment), using the
encoder knob as an alternate to the control switch.
Zamboni FastICE
®
Operating Manual
DK - 11000
Page 17 of 44

Advertisement

Table of Contents
loading

Table of Contents