Starting Up The Switch - Cisco MDS 9200 Series Installation Manual

Cisco systems hub/switch installation guide
Hide thumbs Also See for MDS 9200 Series:
Table of Contents

Advertisement

Starting Up the Switch

S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m
To attach the grounding lug and cable to the chassis, follow these steps:
Step 1
Use a wire-stripping tool to remove approximately 0.75 in. (19 mm) of the covering from the end of the
grounding cable.
Step 2
Insert the stripped end of the grounding cable into the open end of the grounding lug.
Step 3
Use the crimping tool to secure the grounding cable in the grounding lug.
Step 4
Remove the adhesive label from the grounding pad on the chassis.
Step 5
Place the grounding lug against the grounding pad so that there is solid metal-to-metal contact, and insert
the two M4 screws with washers through the holes in the grounding lug and into the grounding pad.
Step 6
Ensure that the lug and cable do not interfere with other equipment.
Step 7
Prepare the other end of the grounding cable and connect it to an appropriate grounding point in your
site to ensure adequate earth ground.

Starting Up the Switch

This section provides instructions for powering up the switch and verifying component installation.
Hazardous voltage or energy is present on the backplane when the system is operating. Use caution
Warning
when servicing.
Blank faceplates and cover panels serve three important functions: they prevent exposure to
Warning
hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI)
that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not
operate the system unless all cards, faceplates, front covers, and rear covers are in place. During this
procedure, wear grounding wrist straps to avoid ESD damage to the switch.
Do not connect the MGMT 10/100 Ethernet port to the LAN until the initial switch configuration has
Note
been performed. For instructions on configuring the switch, see the Cisco MDS 9000 Family NX-OS
Interfaces Configuration Guide or the Cisco Fabric Manager Interfaces Configuration Guide. For
instructions on connecting to the console port, see the
page
Warning
When installing or replacing the unit, the ground connection must always be made first and
disconnected last.
To power up the switch and verify hardware operation, follow these steps:
Verify that empty module slots have filler panels installed, the faceplates of all modules are flush with
Step 1
the front of the chassis, the ejector levers are fully closed and approximately parallel to the front of the
module, and the captive screws of the power supplies, fan module, and all supervisor, switching, or
services modules are tight.
Cisco MDS 9200 Series Hardware Installation Guide
2-26
Statement 1034
3-2.
Statement 1046
Chapter 2
Installing the Cisco MDS 9200 Series
Statement 1029
"Connecting to the Console Port" section on
OL-19588-01

Advertisement

Table of Contents
loading

Table of Contents