Download Print this page
TMG -184517ST Product Manual

TMG -184517ST Product Manual

1845 rv motorhome storage shelter

Advertisement

Quick Links

Main Specifications:
17
Page 0 of

Advertisement

loading
Need help?

Need help?

Do you have a question about the TMG-184517ST and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for TMG TMG-184517ST

  • Page 1 Main Specifications: Page 0 of...
  • Page 2: Main Specifications

    Main Specifications : - Assembly size : W5.5 x L13.5 x H5.3 (m) / 18 x 45 x 17 (ft) - Shoulder height : 4 m / 13 ft Front roll up door : 4.09 x 4.26 (m) / 13 x 14 (ft) Prior to assembly Please read the instructions carefully before installation.
  • Page 3 TMG-184517ST Part List Parts Graphical Description code Peak arch tube Upper rafter tube (middle truss) Upper rafter tube (front truss) Upper rafter tube (rear truss) Shoulder tube (middle truss and rear truss) Shoulder tube (front truss) Sidewall tube (middle truss)
  • Page 4 Door columnbaseplate (front truss) Middle column baseplate (rear truss) Middle truss baseplate Ratchets Door frame lower tube (front and rear truss) Door frame upper tube (front truss) Rear frame middle tube Door frame middle horizontal tube (front truss) Door frame middle horizontal tube (rear truss) Door frame middle horizontal tube (rear truss)
  • Page 5 One wheel rope pulley (Pre-installed on 2A) Ceiling cross bar (front and rear truss) Ceiling cross bar (front and rear truss) Bottom tension bar (Front cover) Bottom tension bar (Rear cover) Bottom middle tension bar (Rear cover) Diagonal bracing bar (1st and last span) Tube clamp φ58mm...
  • Page 6 Half round head bolt M10 x 80mm Half round head bolt M8 x 70mm Half round head bolt M8 x 80mm Hex bolt M10 x 30mm Hex bolt M10 x 50mm Nylon rope Water plug Top cover Front cover panel Rear cover panel Braided rope 1 bundle...
  • Page 7  Mark the ground in the final building location with a line showing the positions of base plates, front, and rear doors. All lines should be drawn from center to center of all baseplate tubes. Diagonal line X must be equal to Y. ...
  • Page 8 Picture 2  Parts used to install the rear truss in this step (refer to Picture 3) : (1) Peak arch tube (#1) (2) Upper rafter tube (#2B) (2) Shoulder tube (#3) (2) Sidewall tube (#4A) (12) Half round head bolt (#18) Picture 3 Page 7 of...
  • Page 9  Parts used to install (8) middle trusses in this step (refer to Picture 4). (1x8) Peak arch tube (#1) (2x8) Upper rafter tube (#2) (2x8) Shoulder tube (#3) (2x8) Sidewall tube (#4) (12x8) Half round head bolt (#18) Picture 4 ...
  • Page 10 Step 3 : Put up the front (1 ) truss  Use of a crane or forklift is recommended, otherwise a team can use ropes to lift the trusses, but you have to make sure it is safe, and have enough manpower.
  • Page 11 Picture 7 Step 5 : Install the diagonal bracing bars (#13)  Connect diagonal bracing bar (#13) on the first and last span between the shoulder tube and sidewall tube (#3A and #4) with tube clamp (#13A), use bolt (#19A) (Picture 8). ...
  • Page 12 Step 6 : Install the remaining parts on the front truss (Picture 9)  Parts used in this step : (2) Door frame upper tube (#9) (2) Door frame lower tube (#8) (2) Door frame horizontal tube (#10) (2) Bottom tension bar (#12) (4) Half round head bolt (#18) (6) Hex bolt (#18A) (6) Hex bolt (#19)
  • Page 13 (1) Ceiling cross bar (#11D) (2) Bottom tension bar (#12A) (1) Bottom middle tension bar (#12B) (4) Half round head bolt (#18) (6) Half round head bolt (#18A) (6) Hex bolt (#19) (2) Tube clamp (#13B) Picture 10 Step 8 : Install front cover panel ...
  • Page 14 (Picture 11-view from inside) Picture 12 Step 9 : Install rear cover panel The door cover must be zipped. Use rope (#24) to lift up the rear cover (#23A)  from the center grommet and tie it firmly to the truss tube and spread toward both sides through each grommet along the tube (Picture 13).
  • Page 15 Picture 13 Step 10 : Install the top cover (#22) Do not install the cover during windy weather!  Unpack the top cover and place it along one of the long sides of the structure.  Use 3 to 5 ropes (#24) to pull the cover over the top of the structure, 2 or 3 people standing inside on ladders to push upwards will help to move the cover smooth without any damage (Picture 14).
  • Page 16 Step 11 : Stretch and tighten top cover  The roof cover must be stretched and tied to the front and rear truss by rope going through the flap grommets on the cover. Start from the top center and go toward both side on each end. Add or cut the rope as needed. ...
  • Page 17 Picture 16 Step 13 : Install ratchet straps (Picture 17)  Stretch and adjust the cover from left and right, back and forth, to make sure it is square and centered. Cut the groove pocket where it aligns with ratchet (#7A), and use strap (#25) to pull tension tube (#14) toward the ratchet and tie it firmly there.
  • Page 18 After the Installation Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole shelter is well supported. Check all bolts and nuts as well as all connection points to make sure they are all in good position. Check the base plates, adjust the ropes and tie downs if required and clean the cover regularly.