Global Water AquaWave Classic 75GPD Installation, Operation & Maintenance Manual page 11

Reverse osmosis (ro) system
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
7.
System start-up
Ensure RO faucet is turned off/closed.
Turn on main cold water supply valve and ensure
that the 1/4" water supply valve to the RO system
is in open position.
Ensure ball valve on top of tank is in open position.
Purge air from the system by slowly opening up
faucet until water runs smoothly and then turn off.
Over two hours, the pressure in the RO system will
build as water flows through the system. During
this time, monitor the system for any leaks at
connections or fittings.
If leaks are present, fix by ensuring all tubing is cut
squarely, fully inserted and/or by adding more
wraps of Teflon™ tape. Confirm there are no
notches, scratches, or dents in any of the tubing.If
found, replace tubing, or cut approximately 1" off
from damaged area and re-assemble as length
permits.
If the system exhibits no leaks, then allow the
system to fill the tank.
DO NOT USE OR DRINK THE FIRST TANK OF RO
WATER
Turn off the 1/4" water supply valve.
Empty first tank of water by turning on the RO
faucet, letting it run until the water stops flowing.
Turn on the 1/4" water supply valve.
Allow the tank to fill a second time (approximately
1-2 hours) and then enjoy clean, great tasting
water from your new RO system!
5 Stage Reverse Osmosis System
11

Advertisement

Table of Contents
loading

Related Products for Global Water AquaWave Classic 75GPD

Table of Contents